Tavarekere metro station

Tavarekere
Under Construction of this metro station under Namma Metro's Pink Line as of August 2025
General information
Other namesSwagath Cross
Location47, Bannerghatta Rd, SR Krishnappa Garden, Hombegowda Nagar, Bengaluru, Karnataka 560041
Coordinates12°55′46″N 77°36′02″E / 12.92942°N 77.60049°E / 12.92942; 77.60049
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LinePink Line
PlatformsSide platform
Platform-1 → Kalena Agrahara
Platform-2 → Train Terminates Here *
* (Further extension to Nagawara in the future)
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectGR Infraprojects Ltd. (Simplex contract terminated in 2021)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningMay 2026 (May 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Terminus Pink Line
(Operational from May 2026)
Jayadeva Hospital
Dairy Circle
towards Nagawara
Pink Line
(Operational around December 2026)
Location

Tavarekere is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bengaluru, India. Around this metro station holds the main Tavarekere Park followed by some prime locations like Byransandra Lake Park, Sagar Hospitals (Jayanagar) and the famous Dairy Circle Flyover which leads towards Nexus Mall (Koramangala) in the east and towards Lal Bagh in the west.

As per the latest updates, this metro station, under the first phase, covering a total distance of 7.5 km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around May 2026 instead of December 2025.