Red Line (Namma Metro)

Red Line
Overview
Other names
  • Third North–South Corridor
  • Line 8
  • Hebbala–Sarjapura Line
Native nameKeṁpu mārga
StatusUnder Construction
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Connecting linesOperational (1):
Purple Line
Upcoming (3):
Blue Line Orange Line Pink Line
Proposed (1):
Inner Ring Line
Stations28
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)Sarjapur Depot
History
Planned openingDecember 2030 (December 2030) (TBC)
Technical
Line length37 km (23 mi)
Number of tracks2
Character(TBC)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Red Line map (TBC)

Hebbala
Indian Railways Towards
Yesvantpur Jn or SMVT Bengaluru
Ganga Nagar
Veterinary College
Mekhri Circle
Guttahalli Palace
Bengaluru Golf Course
Basaveshwara Circle
KR Circle
Town Hall
Shanthinagar
NIMHANS
Dairy Circle
Dairy Circle on
Pink Line
Under construction
Koramangala II Block
Koramangala III Block
Jakkasandra
Agara
** Blue Line U/C
Ibbaluru
Bellandur Gate
Kaikondrahalli
Doddakannelli
Indian Railways Towards
Hosur or Baiyyappanahalli
Carmelaram
Ambedkar Nagar
Kodathi Gate
Muthanalluru Cross
Dommasandra
Sompura
Kada Agrahara Road
Sarjapura Depot (TBC)
Sarjapura

The Red Line or Hebbal-Sarjapura Line is an under construction metro rail line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro has been planned to become operational around December 2030.

As per latest news updates, the Karnataka Cabinet had approved the Phase 3A of this metro line, linking Sarjapur in southeastern Bengaluru with Hebbal in the north on December 6, 2024. The approval from the Union Cabinet is awaited, as the Centre holds a 50% equity stake in Namma Metro.