Blue Line (Namma Metro)

Blue Line
Overview
Other names
  • ORR East Line
  • Airport Metro
  • Line 5
  • Central Silk Board - KIAL Terminals Line
Native nameನೀಲಿ ಮಾರ್ಗ (Nīli mārga)
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Connecting linesOperational (2):
Purple Line Yellow Line
Upcoming (3):
Red Line Pink Line Orange Line
Stations13 (Phase-2A) + 16 (Phase-2B) = 29
03 (Phase-2B) - Future stations
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)Baiyappanahalli, Doddajala
History
Planned openingPhase 2A - June 2026 (2026-06)
Phase 2B - December 2027 (2027-12)
Technical
Line length58.19 km (36.16 mi)
Number of tracks2
CharacterElevated, At Grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Blue Line Map (TBC)

Central Silk Board
HSR Layout
Agara
Red Line towards Sarjapura
Ibbaluru
Prestige Bellandur
Embassy TechVillage Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards Hosur and
Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura
Indian Railways Towards Krishnarajapuram and
Yelahanka Jn or Bengaluru Cantt.
Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura
Red Line towards Sarjapura
Hebbala
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
KSR Bengaluru and Yelahanka Jn
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Kolar and Yelahanka Jn
Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals

The Blue Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A (Central Silk Board to Krishnarajapura) and Phase-2B (Krishnarajapura to Airport). Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport.

The line passes through the eastern part of Outer Ring Road and passes through many major tech hubs and neighbourhoods of the city, such as HSR Layout, Agara, Bellandur, Kadubeesanahalli, Marathahalli, Doddanekundi, Mahadevapura, Krishnarajapura, Kasturi Nagar, Horamavu, Kalyan Nagar, Hennur, Nagawara, Hebbal and then runs parallely along the National Highway 44, where it passes through Kodigehalli, Jakkur, Yelahanka, Doddajala and then passes along the Airport Road.

The Line is mostly elevated but also has 2 at-grade (surface) sections, at the AFS Yelahanka Campus Bengaluru, and the Airport City station, and also has 1 underground section - at the KIA Terminals . There are 29 stations on the line of which 27 are elevated, 1 is at grade, and 1 is underground - making it the second line, after Purple Line, in the Namma Metro system to contain all 3 station types. The Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at Krishnarajapura, Pink Line at Nagawara and a planned interchange with the proposed Orange Line at Hebbal.

In June 2022, the BMRCL launched the first ever U Girder span on ORR-Airport metro line. The extension of the Purple Line and construction of the Yellow Line is completed and operational, where Construction of Pink Line is currently under progress. The Pink, Yellow and Blue lines will be CBTC-signaling enabled, unlike Namma Metro's first two lines (Purple and Green lines use distance-signaling). In June 2023, the Deputy Chief Minister of Karnataka D. K. Shivakumar informed that Metro line to Kempegowda International Airport will be completed by December 2026, plus or minus 3 months.