Green Line (Mumbai Metro)

Green Line
Overview
StatusUnder construction: Green Line 4, Green Line 4A Proposed: Green Line 10, Green Line 11
OwnerMMRDA
LocaleMumbai and Thane, Maharashtra, India
Termini
Stations38 (Main Line) 15 (Branch Line)
WebsiteLine 4
Service
TypeRapid Transit
SystemMumbai Metro
Depot(s)Mogharpada, Anik Nagar Bus Depot
Rolling stockAlstom Metropolis
History
Planned openingMarch 2026 (2026-03)
Technical
Number of tracks2
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed90 km/h (56 mph)
Highest elevation3.90 m (12.8 ft)
Route map

Green Line
km
to Red Line
Miragaon on Red Line
9.3709
Shivaji Chowk (Mira Road)
8.4980
Kashimira
5.8134
Varsova Char Phata
1.4711
Gaimukh Reti Bandar
0.0000
Gaimukh
Mogharpada Depot
1.2830
Gowniwada
2.6679
Kasarvadavali
3.7414
Vijay Garden
4.6502
Dongripada
6.1158
Tikuji-ni-wadi
6.8914
Manpada (Thane)
7.7567
Kapurbawdi to Orange Line
9.1459
Majiwada
9.9701
Cadbury Junction
10.7628
Mahapalika Marg
11.7987
RTO Thane
12.4772
Teen Haath Naka (Thane)
13.7135
Mulund Naka
15.0615
Mulund Fire Station
16.1744
Sonapur
17.5651
Shangrila
18.4087
Bhandup and Bhandup on Central Line
19.4575
Bhandup Mahapalika
20.2368
Naval Housing
20.9286
Gandhi Nagar (Kanjurmarg) and
Kanjur Marg on
Central Line
Kanjurmarg (West) on Pink Line
21.9307
Surya Nagar
22.9354
Vikhroli and Vikhroli on Central Line
23.6585
Godrej Company
24.8213
Shreyas Cinema
towards Mumbai CSMT
25.4421
Laxmi Nagar (Ghatkopar)
26.5196
Pant Nagar
28.1522
Garodia Nagar
28.7507
Amar Mahal Junction
Santa Cruz–Chembur Link Road
Harbour Line
30.0942
Siddharth Colony to Yellow Line
31.1486
Suman Nagar
Kurla–Mahul BP Refinery Line
32.2269
Anik Nagar Bus Depot
33.0885
Wadala Truck Terminal
34.0885
Bhakti Park (Wadala)
Bhakti Park
on Mumbai Monorail
36.0605
Ganesh Nagar
36.7284
BPT Hospital
towards Panvel
39.1174
Sewri and Sewri on Harbour Line
39.9685
Hay Bunder
40.9929
Coal Bunder
42.1754
Darukhana
43.1529
Wadi Bunder
44.2993
Clock Tower
45.1886
Carnac Bunder
Indira Dock of
Mumbai Port Trust
Mumbai CSMT on Central Line and Harbour Line
46.7731
Chhatrapati Shivaji Maharaj Terminus on Aqua Line

Green Line is part of the Mumbai Metro rail network for the city of Mumbai, Maharashtra, India. During construction the line was divided into 3 smaller lines - Line 4 (Kasarvadavali to Bhakti Park (Wadala)), Line 4A (Kasarvadavali to Gaimukh), and Line 10 (Gaimukh to Shivaji Chowk (Mira Road)). The line also has a proposed spur line called Line 11 from Anik Nagar Bus Depot to Gateway of India. The line proposed to be of length 60.409km of which 35.2km is under construction. The line connects the regions of Mira Bhayandar to Wadala via Gaimukh and Kasarvadavali. Construction of Line 4 started in October 2018 while the during construction of Line 4A started in September 2019. Meanwhile, the proposed Line 10 is currently under environmental review while Line 11 is undergoing Soil testing. The line has a total of elevated 38 stations of which 34 are under construction. The main line is fully elevated and has zero underground stations. In addition, the proposed spur line (Line 11) has 16 stations of which 2 are elevated and the remaining 14 are proposed to be underground.

The line offers interchange with the under construction Orange Line at Kapurbawdi, Pink Line at Gandhi Nagar (Kanjurmarg), and the Yellow Line at Siddharth Colony. In addition the line has a proposed interchange with the Red Line at Shivaji Chowk (Mira Road) and Aqua Line at Chhatrapati Shivaji Maharaj Terminus.