Pink Line (Mumbai Metro)

Pink Line
Overview
StatusUnder construction
OwnerMMRDA
Line number6
LocaleMumbai, Maharashtra, India
Termini
Stations13
WebsitePink Line
Service
TypeRapid transit
SystemMumbai Metro
Depot(s)Kanjur Marg
Rolling stockTitagarh Rail Systems
History
Planned opening2027 (2027)
Technical
Line length15.18 km (9.43 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Highest elevation38 m (125 ft)
Pink Line map

Pink Line
km
Kanjur Marg Depot
0.0000
Vikhroli EEH
Kanjur Marg
on Central Line
Kalyan Junction and Mumbai CSMT
Gandhi Nagar (Kanjurmarg) on Green Line
0.9736
Kanjurmarg (West)
2.6316
IIT Powai
3.6960
Powai Lake
4.5453
Rambaug (Powai)
5.5576
Saki Vihar Road
Mithi River
6.6939
SEEPZ Village
7.8168
Mahakali Caves
9.3646
Shyam Nagar
10.3265
JVLR Junction
Jogeshwari
on Western Line
Dahanu Road and Churchgate
11.4863
Jogeshwari (West)
12.4754
Adarsh Nagar
Lower Oshiwara on Yellow Line
13.2042
Swami Samarth Nagar (Lokhandwala)

Pink Line (Line 6) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The 14.477 km (8.996 mi) elevated line will connect Lokhandwala Complex with Vikhroli and will have 13 stations.

Pink Line will also provide interchanges with Yellow Line 2 at Adarsh Nagar, with Aqua Line 3 at SEEPZ, with Green Line 4 at Kanjur Marg West, and with Red Line 7 at Jogeshwari–Vikhroli Link Road. It also offers connectivity with the Mumbai Suburban Railway's Western line at Jogeshwari and with the Central line at Kanjur Marg. Pink Line is expected to open by December 2027.