Rashtreeya Vidyalaya Road metro station

Rashtreeya Vidyalaya Road
Building showing 'B' Entrance on the Jayanagar 8th block side
General information
Other namesR. V. Road, Rashtreeya Vidyalaya Raste
LocationRashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineGreen Line Yellow Line
PlatformsSide platform

Platform-1Madavara
Platform-2Silk Institute
Platform-3Delta Electronics Bommasandra
Platform-4 → Train Terminates Here

Tracks4
Connections Yellow Line
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes
Architect  IVRCL Ltd.
  HCC - URC Construction JV
Other information
StatusStaffed
Station codeRVR
History
Opened  18 June 2017 (2017-06-18)
  10 August 2025 (10 August 2025)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayanagar
towards Madavara
Green Line Banashankari
Terminus Yellow Line Ragigudda
Location

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the north–south corridor of the Green Line and the east–west corridor of the Yellow Line of Namma Metro serving the 5th, 7th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.

The Yellow Line is operational from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi instead of May 2025 which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister D. K. Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.