Longzexi station

Longzexi

龙泽西
Eastbound platform
Chinese name
Simplified Chinese龙泽西站
Traditional Chinese龍澤西站
Transcriptions
Standard Mandarin
Hanyu PinyinLóngzéxī zhàn
General information
LocationIntersection of Longyu East 1st Road (龙域东一路) and Huichuang Road (回创路), Huilongguan Subdistrict
Changping District, Beijing
China
Coordinates40°04′17″N 116°18′06″E / 40.0713°N 116.301781°E / 40.0713; 116.301781
SystemBeijing Subway station
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line     Line 18
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 18: December 27, 2025 (2025-12-27)
  •      Line 13: December 2027 (2027-12) (expected)
  •      Line 19: December 2029 (2029-12) (planned)
Previous namesLongyu (龙域), Xinlongze (新龙泽), Beijiaonongchang Qiao (北郊农场桥)
Services
Preceding station Beijing Subway Following station
Dongbeiwang
towards Malianwa
Line 18 Huilongguan Xidajie
Future services
Xi'erqi Line 18
Opening 2027
Huilongguan Xidajie
Location
Longzexi
Location in Beijing

Longzexi station (simplified Chinese: 龙泽西站; traditional Chinese: 龍澤西站; pinyin: Lóngzéxī zhàn) is a station on Line 18 and the new Line 13 of the Beijing Subway. The Line 18 section opened on December 27, 2025, whilst the new Line 13 section is expected to open in December 2027. In the future, it will feature interchanges with Line 19 and BCR Northeast Ring line.