Malianwa station

Malianwa

马连洼
Line 16 platform

Line 18 platform
General information
LocationYuanmingyuan West Road (圆明园西路) and Malianwa North Road (马连洼北路)
Haidian District, Beijing
China
Coordinates40°01′57″N 116°16′21″E / 40.032637°N 116.27252°E / 40.032637; 116.27252
Operated byBeijing MTR Metro Line 16 Corp., Ltd.
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 16: December 31, 2016 (2016-12-31)
  •      Line 18: December 27, 2025 (2025-12-27)
Services
Preceding station Beijing Subway Following station
Xibeiwang
towards Bei'anhe
Line 16 Nongda Nanlu
towards Wanpingcheng
Terminus Line 18 Shangdi Software Park
Location
Malianwa
Location in Beijing

Malianwa station (simplified Chinese: 马连洼站; traditional Chinese: 馬連窪站; pinyin: Mǎliánwā zhàn) is an interchange station between Line 16 and Line 18 of the Beijing Subway. Line 16 opened at this station on December 31, 2016. Line 18 opened at this station on December 27, 2025, and serves as its western terminus.