Green Line (Namma Metro)
| Green Line | |||
|---|---|---|---|
This trainset on standby at Banashankari metro station and heading towards Silk Institute metro station | |||
| Overview | |||
| Other names |
| ||
| Native name | ಹಸಿರು ಮಾರ್ಗ (Hasiru mārga) | ||
| Status | Operational | ||
| Owner | Bengaluru Metro Rail Corporation Limited (BMRCL) | ||
| Locale | Bengaluru, Karnataka, India | ||
| Termini | |||
| Connecting lines | Operational (2): Purple Line Yellow Line Upcoming (1): Orange Line Planned (1): Inner Ring Line | ||
| Stations | 32 (Operational) | ||
| Website | bmrc.co.in | ||
| Service | |||
| Type | Rapid transit | ||
| System | Namma Metro | ||
| Depot(s) | Peenya Anjanapura (Under Construction) | ||
| Rolling stock | BEML | ||
| Daily ridership | 170,685 | ||
| Ridership | 62.3 million (2018) | ||
| History | |||
| Opened | 1 March 2014 | ||
| Last extension | 07 November 2024 | ||
| Technical | |||
| Line length | 33.46 km (20.79 mi) | ||
| Number of tracks | 2 | ||
| Character | Elevated and underground | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 750 V DC third rail | ||
| Operating speed | 40 km/h (25 mph) | ||
| |||
The Green Line is a line on the Namma Metro rail system. As of 2025, the line is 33.46 km (20.79 mi) long and connects Madavara in the northwest to Silk Institute in the south. The line connects the north western suburbs and neighbourhoods of Bengaluru, such as Madavara, Jalahalli, Peenya, Yeshwanthpur, Rajajinagar and Malleshwaram along Tumkur Road with the central hub of Majestic and the southern residential areas of Bangalore such as Basavanagudi, Jayanagara, Banashankari, Konanakunte and Thalaghattapura along Kanakapura Road. The Green Line is mostly elevated, with 29 elevated and 3 underground stations. There are two interchanges along the Green Line, One with the Purple Line at Nadaprabhu Kempegowda Station, Majestic and the other with the Yellow Line at Rashtreeya Vidyalaya Road.