Yellow Line (Ahmedabad Metro)

Yellow Line
Overview
StatusOperational
LocaleGandhinagar
Termini
Stations21
Service
TypeRapid transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened16 September 2024 (16 September 2024) (Sector-1 to GNLU and Motera Stadium)
Technical
Line length23.84 km (14.81 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

The Yellow Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. The construction was started in January 2021 and was completed in January 2026.