Yellow Line (Ahmedabad Metro)
| Yellow Line | |||
|---|---|---|---|
| Overview | |||
| Status | Operational | ||
| Locale | Gandhinagar | ||
| Termini | |||
| Stations | 21 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Ahmedabad Metro | ||
| Operator(s) | Gujarat Metro Rail Corporation Limited | ||
| Rolling stock | Hyundai Rotem | ||
| History | |||
| Opened | 16 September 2024 (Sector-1 to GNLU and Motera Stadium) | ||
| Technical | |||
| Line length | 23.84 km (14.81 mi) | ||
| Character | Elevated | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) (Standard gauge) | ||
| Electrification | 750V DC Third Rail | ||
| |||
The Yellow Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. The construction was started in January 2021 and was completed in January 2026.