Ahmedabad Metro

Ahmedabad Metro
A Red Line train of Ahmedabad Metro
Overview
Native nameઅમદાવાદ મેટ્રો
OwnerGujarat Metro Rail Corporation Limited
Area servedAhmedabad
Gandhinagar
GIFT City
Transit typeRapid transit
Number of lines4
Line number
Number of stations54
Annual ridership48,399,000 (2025) 31.1 %
Chief executiveKatikithala Srinivas (Chairman)
HeadquartersBlock No.1, First Floor, Karmayogi Bhavan, Sector 10/A, Gandhinagar-382010
WebsiteGujarat Metro
Operation
Began operation4 March 2019 (2019-03-04)
Operator(s)Gujarat Metro Rail Corporation Limited
CharacterUnderground and elevated
Rolling stockHyundai Rotem
Train length3 coaches
Technical
System length67.56 km (41.98 mi)
No. of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail
Average speed33 km/h (21 mph)
Top speed80 km/h (50 mph)
Route map

Ahmedabad Metro
Mahatma Mandir
Sector-24 (Gandhinagar)
Sector-16 (Gandhinagar)
Juna Sachivalaya
Akshardham
Sachivalaya
Sector-10A (Gandhinagar)
Sector-1 (Gandhinagar)
Infocity
Indroda Depot
Dholakuva Circle
Randesan
GIFT City
Raysan
PDEU
GNLU
Koba Gam
Juna Koba
Koba Circle
Narmada Canal
Tapovan Circle
Vishwakarma College
Koteshwar Road
Motera Stadium
Thaltej Gam
Sabarmati
Thaltej
AEC
Doordarshan Kendra
Sabarmati Railway Station
Gurukul Road
Ranip
Gujarat University
Vadaj
Commerce Six Road
Vijay Nagar
SP Stadium
Usmanpura
Old High Court
Gandhigram
Paldi
Shahpur
Shreyas
Gheekanta
Rajiv Nagar
Kalupur Railway Station
Jivraj Park
Kankaria East
APMC
Apparel Park Depot
Gyaspur Depot
Apparel Park
Amraiwadi
Rabari Colony
Vastral
Nirant Cross Road
Vastral Gam

Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad, Gandhinagar, and GIFT City in Gujarat state of India. Currently the network is 67.56 km (41.980 mi) long and has 54 operational stations.

The Gujarat Metro Rail Corporation Limited was established in February 2010 and the 40.03 km (24.873 mi) long Phase–1 of the project was approved in October 2013 with two corridors, North–South and East–West. The construction started on 14 March 2015. A 6.5 km (4.039 mi) section of East–West corridor was inaugurated on 4 March 2019. The rest of the Phase–1 was inaugurated on 30 September 2022; except the Thaltej Gam end and three stations. The Phase–1 was completed in December 2024; except Sabarmati Railway Station metro station.

The Phase–2 was approved in February 2019 and the construction was started in January 2021. The some part of Yellow Line as well as Violet Line was opened in September 2024. It was gradually opened with completion of Phase–2 in January 2026.