Valley Metro Streetcar

Valley Metro Streetcar (S Line)
Overview
OwnerValley Metro
Line numberS Line
LocaleTempe, Arizona, United States
Termini
Stations14
Websitewww.valleymetro.org/streetcar
Service
TypeStreetcar
SystemValley Metro Rail
Services1
Operator(s)Valley Metro
Rolling stock6 Brookville Liberty Modern Streetcars
Ridership793,628 (FY 2024)
History
OpenedMay 20, 2022 (2022-05-20)
Technical
Line length3 mi (4.8 km)
Number of tracks2
CharacterStreetcar in mixed traffic
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line750 V DC + battery
Route map
Valley Metro Streetcar highlighted in green
Rio East–Dobson Extension (proposed)
Marina Heights/Rio Salado Pkwy
Hayden Ferry/Rio Salado Pkwy
Tempe Beach Park/Rio Salado Pkwy
Mill Ave/3rd St
5th St/Ash Ave | 6th St/Mill Ave
University Dr/Ash Ave
9th St/Mill Ave
11th St/Mill Ave
College Ave/Apache Blvd
Paseo del Saber/Apache Blvd
Rural/Apache Blvd
Dorsey/Apache Blvd

All stations are accessible
Key
Valley Metro Streetcar
A Line

The Valley Metro Streetcar (S Line), formerly known as the Tempe Streetcar, is a modern streetcar in Tempe, Arizona, operated by Valley Metro. The 3-mile (4.8 km) line serves downtown Tempe, Tempe Town Lake, and the Arizona State University Tempe campus with 14 stations. Construction began in 2017, and the line opened for service on May 20, 2022.