Turin–Genoa railway

Turin–Genoa railway
Map of the railway line
Overview
OwnerRFI
Service
Operator(s)Trenitalia
History
Opened1848–1853
Technical
Line length169 km (105 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3000 V DC
Route map

0.000
Torino Porta Nuova
239
depôt
4.318
Torino Lingotto
234
Turin–Saluzzo tramway (1881–1950)
Sangone torrent
Sangone junction:
to Pinerolo
8.010
Moncalieri
225
Testona
228
13.030
Trofarello
233
16.441
Cambiano-Santena
243
21.815
Pessione
249
30.160
Villanova d'Asti
256
32.975
San Paolo Solbrito
231
A 21 / E70
40.771
Villafranca-Cantarana
156
44.888
Baldichieri-Tigliole
146
48.613
San Damiano d'Asti
138
Asti-Canale tramway (1882–1935)
from Castagnole / from Chivasso
55.794
Asti
117
to Genoa (via Acqui) / to Mortara
65.177
Castello d'Annone
113
68.317
Rocchetta Tanaro-Cerro
110
Cerro
closed in 1927
72.037
Masio-Quattordio
(closed in 2003)
107
75.547
Felizzano
101
81.843
Solero
99
90.075
Alessandria
96
to San Giuseppe di Cairo,
Castagnole delle Lanze and Cavallermaggiore
to Ovada
Forte Ferrovia
to Piacenza
99.608
Frugarolo (FVO)│
Frugarolo-
Boscomarengo
115
FS–FVO link
FVO line to Basaluzzo
(closed in 1948)
Donna
closed in 2008
137
110.082
Novi San Bovo
to Tortona
111.683
Novi Ligure
197
114.988
Novi Precedenza
???
118.813
Serravalle Scrivia
123.132
Arquata Scrivia
(moved in 1916)
240
124.645
Scavalcamento junction
Second Pass
125.752
Rigoroso
258
128.437
Pietrabissara
274
Scrivia River
Borlasca tunnel
133.205
Isola del Cantone
298
Craverina tunnel
Giacoboni tunnel
Villavecchia tunnel
137.017
Ronco Scrivia
325
Second Pass
Ronco tunnel│Pieve tunnel
140.688
Borgo Fornari per Voltaggio
353
142.270
Busalla
360
142.762
Giovi tunnel (3,265 m)
Mignanego
148.288
Piano Orizzontale dei Giovi
188
Campomorone viaduct
Verde and Ricco torrents
152.690
Genova Pontedecimo
90
154.136
Genova San Biagio
(opened 2005)
156.752
Genova Bolzaneto
47
Fegino junction
Granarolo viaduct
Succursale junction
158.979
Rivarolo junction
Granarolo tunnel to
Genova Piazza Principe
158.979
Genova Rivarolo
25
Polcevera junction
from Asti (via Acqui)
160.136
Torbella junction
Genova Campasso
A 10
Genova-Saint George Bridge
161.470
Genova Sampierdarena
Smistamento
San Gaetano tunnel
162.219
Genova Sampierdarena
9
Genova Marittima
Landi tunnel
0.980
Genova Via di Francia
(opened 2005)
from Fegino junction
Genova Piazza Principe
Genova Brignole
elev (M)
or length (m)
in metres
Source: Italian railway atlas

The Turin–Genoa railway line is a major Italian rail line, connecting the cities of Turin and Genoa. It is 169 kilometres (105 mi) long.