| Alessandria–Novara–Arona railway |
|---|
|
|
| Status | in use |
|---|
| Owner | RFI |
|---|
| Locale | Lombardy and Piedmont, Italy |
|---|
| Termini | |
|---|
|
| Type | Heavy rail |
|---|
| Operator(s) | Trenitalia, Trenord |
|---|
|
| Opened | 1854 (1854) |
|---|
|
| Line length | 67 km (42 mi) |
|---|
| Number of tracks | 2 |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Electrification | 3 kV DC |
|---|
| Operating speed | 135 km/h (84 mph) |
|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
from Ovada
|
|
|
|
|
|
| from Savona and | | Cavallermaggiore |
|
|
|
|
|
90.075
|
Alessandria
|
96 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
89.420
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.572
|
Valmadonna
|
117 m a.s.l.
|
|
|
|
|
7.377
|
Valenza tunnel (2330 m)
|
|
|
|
|
9.707
|
|
|
|
|
|
12.392
|
|
112 m a.s.l.
|
|
|
|
|
|
to Vercelli
|
|
|
|
|
|
Bozzole-Monte (closed)
|
98 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
18.618
|
Torreberetti
|
94 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
24.449
|
Sartirana
|
99 m a.s.l.
|
|
|
|
|
28.940
|
Valle Lomellina
|
100 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
36.074
|
Olevano
|
104 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
40.793
|
Mortara
|
108 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
46.138
|
Albonese
|
116 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
48.616
|
Borgo Lavezzaro
|
118 m a.s.l.
|
|
|
|
|
52.996
|
Vespolate
|
124 m a.s.l.
|
|
|
|
|
56.810
|
Garbagna
|
131 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
65.028
|
|
151 m a.s.l.
|
|
|
|
|
|
Novara Nord
|
|
|
|
|
|
Novara FNM (old)
|
|
|
|
|
65.368
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
68.303
|
|
160 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
76.871
|
Cameri crossing loop
|
|
|
|
|
78.121
|
Bellinzago
|
216 m a.s.l.
|
|
|
|
|
81.616
|
Oleggio
|
235 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
85.151
|
Marano Ticino
|
258 m a.s.l.
|
|
|
|
|
89.687
|
Varallo Pombia
|
292 m a.s.l.
|
|
|
|
|
92.540
|
Borgo Ticino
|
270 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
97.515
|
| Dormelletto Paese | | opened in 1935 |
|
227 m a.s.l.
|
|
|
|
|
|
deviation opened in 1905
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100.769
|
|
205 m a.s.l.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
The Alessandria–Novara–Arona railway is a railway line in Italy that connects Alessandria to Arona on Lake Maggiore, passing through Novara.
The management of the infrastructure is the responsibility of RFI SpA, a subsidiary of Ferrovie dello Stato, which classifies the line as complementary.