Sungai Buloh station

 KA08   PY04  Sungai Buloh
The station's signboard after being transferred to the Putrajaya Line, with a trainset entering the station from Kampung Batu.
General information
Other namesMalay: سوڠاي بولوه (Jawi)
Chinese: 双溪毛糯
Tamil: சுங்கை பூலோ
LocationSungai Buloh
Petaling & Gombak, Selangor
Malaysia
Coordinates3°12′22″N 101°34′49″E / 3.20611°N 101.58028°E / 3.20611; 101.58028
SystemRapid KL (MRT)
KTM Komuter
Owned byMRT Corp
Railway Assets Corporation
Operated by Rapid Rail
Keretapi Tanah Melayu
LinesWest Coast Line
12 Putrajaya Line
Platforms2 side platforms (KTM)
1 island platform (MRT)
Tracks4 (KTM)
2 (MRT)
Construction
Structure type KA08  At-grade
 PY04  Elevated
ParkingAvailable with payment (1,236 parking bays, 258 motorcycle bays)
Bicycle facilitiesAvailable (16 bicycle bays)
AccessibleYes
Other information
Station code KA08 
 PY04  (from 16 June 2022)
 KG01  (until 15 June 2022)
History
Opened1892 (1892) (KTM)
16 December 2016 (2016-12-16) (Kajang Line)
16 June 2022 (2022-06-16) (Putrajaya Line)
Rebuilt2016 (2016) (KTM)
Electrified1995 (1995) (KTM)
Services
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Kuang Tanjung Malim–Port Klang Line Kepong Sentral
towards Port Klang
Preceding station Keretapi Tanah Melayu (ETS) Following station
Ipoh
towards Padang Besar
KL Sentral–Padang Besar (Express) Kuala Lumpur
Tanjung Malim
towards Padang Besar
KL Sentral–Padang Besar (Platinum)
Tanjung Malim
towards Butterworth
KL Sentral–Butterworth (Platinum)
Tanjung Malim
towards Padang Besar
Padang Besar–JB Sentral (Platinum) Kuala Lumpur
Tanjung Malim
towards Butterworth
Butterworth–JB Sentral (Platinum)
Rawang
towards Padang Besar
Padang Besar–JB Sentral (Gold)
Batang Kali
towards Butterworth
Butterworth–Segamat (Gold) Kuala Lumpur
towards Segamat
Rawang
towards Ipoh
KL Sentral–Ipoh (Gold) Kepong Sentral
Preceding station Following station
Kampung Selamat Putrajaya Line Damansara Damai
Location

The Sungai Buloh station is an integrated train station serving the suburb of Sungai Buloh in Selangor, Malaysia. It is located to the northwest of Malaysia's capital city, Kuala Lumpur.

It is an interchange station, with one section catering to KTM Komuter's Tanjung Malim–Port Klang Line and KTM ETS services, and another section for the Putrajaya Line (formerly the Kajang Line). However, there is no paid-area integration between both sections as the two services use different ticketing systems and are operated by two different companies. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the MRT Kajang Line (then known as the MRT Sungai Buloh-Kajang).

The station was the northern terminus of the MRT Kajang Line until October 2021, after which the MRT portion of the station was closed along with Kampung Selamat and Kwasa Damansara until the opening of the MRT Putrajaya Line. This closure was executed to facilitate the transfer of the three MRT stations to the newly completed MRT Putrajaya Line, which officially commenced operations on 16 June 2022.