Philippine National Railways

Philippine National Railways
Network map, showing active lines (orange), inactive lines (black), historically proposed lines (gray) and the under-construction North South Commuter Railway (red).
Overview
Main regionsMetro Manila, Calabarzon, Bicol Region
Stations operated138
Parent companyGovernment of the Philippines under the Department of Transportation
HeadquartersTutuban, Tondo, Manila
Key people[Richard F. Peralta] (Chairman)
Deovanni Miranda (General Manager)
LocaleLuzon
Dates of operationJune 20, 1964 (1964-06-20)–present
PredecessorsManila Railroad Company
Technical
Track gauge
  • 1,067 mm (3 ft 6 in)
  • 1,435 mm (4 ft 8+12 in) standard gauge (future)
Electrification1,500 V DC overhead lines: North–South Commuter Railway (future)
Length133.09 km (82.70 mi) (active)
Operating speed20–40 km/h (12–25 mph)
Other
Websitepnr.gov.ph
Preview warning: Page using Template:Infobox rail with unknown parameter "status"

The Philippine National Railways (PNR) (Filipino: Pambansang Daang-bakal ng Pilipinas; Spanish: Ferrocarril Nacional de Filipinas) is a state-owned railway company in the Philippines which operates one commuter rail service between Laguna and Quezon, and local services between Sipocot, Naga, Lupi, and Legazpi in the Bicol Region. It is an attached agency of the Department of Transportation, formerly known as the Ferrocaril Manila-Dagupan Line, and less well-known Manila Railroad (MRR).

Philippine National Railways traces its roots to the Ferrocarril de Manila-Dagupan, founded on November 24, 1892, during the Spanish colonial period, and later becoming the Manila Railroad Company (MRR) during the American colonial period. Founded on June 20, 1964, by virtue of Republic Act No. 4156, the PNR used to operate over 1,100 km (684 mi) of route from La Union to the Bicol Region. However, neglect reduced the railway's service, and persistent problems with informal settlers in the 1990s and natural disasters in the 2000s contributed further to its decline. The government is currently in the process of reinvesting in the railway through numerous projects set to revive defunct lines and create new ones.