New Beijing Poly Plaza

New Beijing Poly Plaza
新保利大厦
Interactive map of the New Beijing Poly Plaza area
General information
TypeOffice/mixed
LocationChaoyangmen North Street, Dongcheng, Beijing, China
Coordinates39°55′54″N 116°25′34″E / 39.9316°N 116.426°E / 39.9316; 116.426
Construction started2003
Completed2007
CostUS$180 million
OwnerChina Poly Group Corporation
Height
Height110 m
Technical details
Floor count24
Floor area103.308 m2
Design and construction
ArchitectsSkidmore, Owings and Merrill
Mark Sarkisian, P.E. S.E., Partner
and Aaron Mazeika, P.E., Associate
Structural engineerSkidmore, Owings and Merrill
for base building: Beijing Special Engineering Design and Research Institute
wind engineer: Shifu Gu, Mechanics & Engineering Science Department, Peking University
Main contractor(cable nets) Yuanda China, Shenyang, China
Advanced Structures Inc., Culver City, California
Preview warning: Page using Template:Infobox building with deprecated parameter "start_date". Replace with "construction_start_date".
Preview warning: Page using Template:Infobox building with deprecated parameter "caption". Replace with "image_caption".
Preview warning: Page using Template:Infobox building with deprecated parameter "management". Replace with "operator".
Preview warning: Page using Template:Infobox building with deprecated parameter "opening". Replace with "opening_date".

The New Beijing Poly Plaza is a building complex in Dongcheng, Beijing, China. Completed in 2007 for the China Poly Group Corporation, it houses the company headquarters, other office space, retail, restaurants, and the Poly Museum.

The New Beijing Poly Plaza sits northeast of the Forbidden City on the 2nd Ring Road, near the Beijing Subway entrance of Exit D of Dongsi Shitiao Station of Line 2. Its large atrium looks out onto a major highway intersection and across the road to the earlier China Poly Headquarters.