Line 13 (Shenzhen Metro)

Line 13
A train of Shenzhen Metro Line 13
Overview
Other namesShiyan Line
(石岩线; 石岩線; shíyán xiàn)
StatusOperational
LocaleBao'an, Nanshan and Guangming districts
Shenzhen, Guangdong
Termini
Stations15
Color on map     Light Orange (#de7c00)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)MTR CREC Metro (Shenzhen) Company Limited
History
Opened28 December 2024 (2024-12-28) (Phase 1 South Section)
Last extension28 December 2025 (2025-12-28) (Phase 1 North Section)
Technical
Line length6.36km (Phase 1 South)
22.5km (Phase 1 total)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead Line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Lisonglang
Xiacun
Shangcun
Gongming Square
Xinzhuang
Jiangwei
Gongming Depot
Yueliang Road
Fenghuang Town
Deya Road
6B to SUAT
Guangmingcheng
Hong'ao Park
Phase 2 (Northern Extension)
Phase 1
Shangwu
Shiyan
Luozu
Yingrenshi
Baiwang
Liuxiandong
Shigu
Xili railway station
Hi-Tech North
Hi-Tech Central
1 to Luohu
Shenzhen University
Yuehaimen
Keyuan
Houhai
Talent Park
Neihu Stabling Yard
Shenzhen Bay Checkpoint
Phase 1
Phase 2 (Southern Extension)
Tide Park
Opera House
Dongjiaotou

Line 13 of the Shenzhen Metro is one of the four new operational metro lines of the metro's Phase IV expansion in the city of Shenzhen, Guangdong. The line first opened on 28 December 2024.

The 6.36km Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central opened on 28 December 2024. The Phase 1 North section (except Xili High Speed Railway Station) entered service on 28 December 2025 at 10:18 am, connecting Hi-Tech North to Shangwu (execpt Xili High Speed Railway Station). Phase 2 is expected to open in 2026 and Xili High Speed Railway Station is expected to open in 2027. The first phase of the line is 23 km (14 mi) long and uses eight car type A trains with a maximum operating speed of 100 km/h (62 mph).

Like Line 4, Line 13 is operated by MTR Corporation (Shenzhen).