Karangkates railway tunnel

Karangkates railway tunnel
Eka Bakti Karya railway tunnel in 2010
Interactive map of Karangkates railway tunnel
Overview
LocationSumberpucung, Malang Regency, East Java
Statusactive
RouteWlingi - Malang
CrossesKertosono-Bangil railway line
Startkm 84+094
Endkm 84+835
No. of stationsPogajih
Operation
Work begun1965
Constructed1965
Opens1970
OwnerKereta Api Indonesia
Technical
Length741 m (2.431 ft)
Track gauge1067 mm

Karangkates railway tunnel is a railway tunnel that neared by the Karangkates Dam that build in 1965 and finished in 1970 by the Government of Indonesia at the same time the construction of the Karangkates Dam.

This railway tunnel has the number wisdom building 357. This railway tunnel is located between the Lahor railway bridge and the Dwi Bakti Karya railway tunnel (Karangkates II).