Karangkates II railway tunnel

Karangkates II railway tunnel
Gajayana will entering the Karangkates II railway tunnel, 2021
Interactive map of Karangkates II railway tunnel
Overview
LocationSumberpucung, Malang Regency, East Java
Statusactive
RouteWlingi - Malang
CrossesKertosono-Bangil railway line
Startkm 83+087
Endkm 83+527
No. of stationsSumber Pucung
Operation
Work begun1965
Constructed1965
Opens1970
OwnerKereta Api Indonesia
Technical
Length440 m (1.440 ft)
Track gauge1067 mm

Karangkates II railway tunnel is a railway tunnel that build in 1965 and finished in 1970 with a Karangkates railway tunnel by the Government of Indonesia at the same time the construction of the Karangkates Dam.

This tunnel is 440 meters long and is managed by Operations Region VIII Surabaya part of Malang Regency.

The railway tunnel has the number wisdom building 352. If a person go east, this railway tunnel is located after Karangkates I railway tunnel.