Karangkates II railway tunnel
| Karangkates II railway tunnel | |
|---|---|
Gajayana will entering the Karangkates II railway tunnel, 2021 | |
Interactive map of Karangkates II railway tunnel | |
| Overview | |
| Location | Sumberpucung, Malang Regency, East Java |
| Status | active |
| Route | Wlingi - Malang |
| Crosses | Kertosono-Bangil railway line |
| Start | km 83+087 |
| End | km 83+527 |
| No. of stations | Sumber Pucung |
| Operation | |
| Work begun | 1965 |
| Constructed | 1965 |
| Opens | 1970 |
| Owner | Kereta Api Indonesia |
| Technical | |
| Length | 440 m (1.440 ft) |
| Track gauge | 1067 mm |
Karangkates II railway tunnel is a railway tunnel that build in 1965 and finished in 1970 with a Karangkates railway tunnel by the Government of Indonesia at the same time the construction of the Karangkates Dam.
This tunnel is 440 meters long and is managed by Operations Region VIII Surabaya part of Malang Regency.
The railway tunnel has the number wisdom building 352. If a person go east, this railway tunnel is located after Karangkates I railway tunnel.