| Terontola–Foligno railway |
|---|
|
|
| Status | in use |
|---|
| Owner | Rete Ferroviaria Italiana |
|---|
| Line number | 106 |
|---|
| Locale | Umbria, Tuscany, Italy |
|---|
| Termini | |
|---|
|
| Type | Heavy rail |
|---|
| Operator(s) | Trenitalia |
|---|
|
| Opened | 21 July 1866 |
|---|
|
| Line length | 82 km (51 mi) |
|---|
| Number of tracks | 1 |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Electrification | 3 kV DC |
|---|
|
|
|
|
|
|
|
km
|
|
|
|
|
|
|
|
|
|
|
|
|
82.200
|
Terontola-Cortona
|
271 m
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
78.795
|
Borghetto di Tuoro
|
265 m
|
|
|
|
|
|
|
|
|
|
|
74.762
|
Tuoro sul Trasimeno
|
267 m
|
|
|
|
|
70.207
|
Passignano sul Trasimeno
|
263 m
|
|
|
|
|
63.679
|
Torricella
|
260 m
|
|
|
|
|
|
Magione tunnel (1,301 m)
|
|
|
|
|
60.879
|
Magione
|
252 m
|
|
|
|
|
55.423
|
Monte Melino (1939–1998)
|
229 m
|
|
|
|
|
49.616
|
Ellera-Corciano
|
256 m
|
|
|
|
|
|
to Tavernelle (closed 1960)
|
|
|
|
|
46.326
|
Perugia Silvestrini (opened 2003)
|
|
|
|
|
|
|
|
|
|
|
43.763
|
Perugia Capitini (opened 2008)
|
|
|
|
|
41.775
|
Perugia Università (opened 2003)
|
|
|
|
|
|
|
|
|
|
|
39.580
|
Perugia (Fontivegge)
|
304 m
|
|
|
|
|
|
|
|
|
|
|
32.765
|
Perugia Montebello (opened 1962)
|
250 m
|
|
|
|
|
|
|
|
|
|
|
28.333
|
Perugia Ponte San Giovanni
|
208 m
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24.438
|
Perugia Aeroporto (1939–1939)
|
|
|
|
|
24.438
|
Collestrada (1866–1930)
|
|
|
|
|
22.600
|
Ospedalicchio (opened 1939)
|
200 m
|
|
|
|
|
|
|
|
|
|
|
19.026
|
Bastia
|
203 m
|
|
|
|
|
15.639
|
Assisi
|
222 m
|
|
|
|
|
10.009
|
Cannara (closed 1995)
|
210 m
|
|
|
|
|
4.904
|
Spello
|
220 m
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0.000
|
Foligno
|
239 m
|
|
|
|
|
|
|
|
|
|
|
km
|
|
|
|
|
|
|
|
|
|
|
| Source: Italian railway atlas
|
|
| |
|
The Terontola–Foligno railway is an electrified, standard-gauge Italian railway that connects the Florence–Rome railway in Terontola-Cortona with the Rome–Ancona railway in Foligno, passing through Perugia and Assisi.