| Dresden Hbf–Werdau wye |
|---|
|
| Line number |
- 6258; Saxon DW
- 6257; Saxon DWCh
|
|---|
| Locale | Saxony, Germany |
|---|
| Termini | |
|---|
|
| Route number | 510, 510.3 |
|---|
|
| Line length | 136.304 km (84.695 mi) |
|---|
| Number of tracks | 2 |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Minimum radius | 213 m (699 ft) |
|---|
| Electrification | 15 kV/16.7 Hz AC overhead catenary |
|---|
| Operating speed | 120 km/h (74.6 mph) (maximum) with tilting: 160 km/h (99.4 mph) |
|---|
| Maximum incline | 2.6% |
|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
-0.048
|
Dresden Hbf
|
117 m
|
|
|
|
|
|
|
|
|
|
|
1.100
|
Dresden Altstadt junction (Bk)
|
|
|
|
|
|
from Dresden-Altstadt Elbe bank
|
|
|
|
|
1.500
|
Dresden-Altstadt
|
120 m
|
|
|
|
|
2.922
|
Dresden-Plauen since 1926
|
135 m
|
|
|
|
|
3.700
|
Dresden-Plauen until 1926
|
139 m
|
|
|
|
|
0
|
| Felsenkeller Tunnel, | | roof removed in 1895 (56 m) |
|
|
|
|
|
3.820
|
Bk Felsenkeller
|
|
|
|
|
4.600
|
|
|
|
|
|
5.528
|
Freight line to Tharandt (see below)
|
|
|
|
|
5.670
|
Freital Ost junction (Bk)
|
155 m
|
|
|
|
|
5.717
|
to Possendorf
|
|
|
|
|
6.844
|
Freital-Potschappel
|
162 m
|
|
|
|
|
|
Narrow gauge line to Nossen and
|
|
|
|
|
|
Niederhermsdorf coal branch line
|
|
|
|
|
8.736
|
Freital-Deuben
|
176 m
|
|
|
|
|
10.092
|
Freital-Hainsberg
|
187 m
|
|
|
|
|
|
|
|
|
|
|
11.550
|
Freital-Hainsberg West
|
190 m
|
|
|
|
|
|
Freight line from Freital Ost junction
|
|
|
|
|
13.705
|
Tharandt
|
208 m
|
|
|
|
|
15.920
|
Bk Breiter Grund
|
|
|
|
|
18.020
|
Edle Krone
|
281 m
|
|
|
|
|
18.200
|
Edle Krone Tunnel (122 m)
|
|
|
|
|
|
Maximum gradient 2.6% (1:37.5)
|
|
|
|
|
21.520
|
Bk Seerenteich
|
|
|
|
|
25.369
|
Klingenberg-Colmnitz
|
436 m
|
|
|
|
|
|
| Narrow gauge lines to Frauenstein | | and Mohorn |
|
|
|
|
|
27.450
|
Colmnitz Viaduct(148 m)
|
|
|
|
|
30.850
|
Niederbobritzsch
|
407
|
|
|
|
|
31.250
|
Niederbobritzsch Viaduct (175 m)
|
|
|
|
|
|
|
|
|
|
|
35.890
|
Muldenhütten
|
395 m
|
|
|
|
|
36.490
|
Muldenhütten Viaduct (196 m)
|
|
|
|
|
38.510
|
Kunstgraben Tunnel (36 m; roof removed)
|
|
|
|
|
|
from Halsbrücke
|
|
|
|
|
|
from (Moldava–) Holzhau
|
|
|
|
|
40.005
|
Freiberg (Sachs)
|
413 m
|
|
|
|
|
|
to Nossen
|
|
|
|
|
42.300
|
Bk Hospitalwald
|
|
|
|
|
42.810
|
Nossen–Moldava
|
|
|
|
|
45.380
|
Kleinschirma
|
415 m
|
|
|
|
|
48.720
|
Frankenstein Viaduct (349 m)
|
|
|
|
|
49.819
|
Frankenstein (Sachs)
|
396 m
|
|
|
|
|
52.240
|
Bk Kaltes Feld
|
|
|
|
|
54.380
|
Bk Memmendorf
|
|
|
|
|
57.149
|
Oederan
|
407 m
|
|
|
|
|
59.100
|
Bk Breitenau
|
|
|
|
|
61.560
|
Bk Hetzdorf
|
|
|
|
|
|
(new route 1992)
|
|
|
|
|
61.897
|
Hetzbach viaduct (344 m)
|
|
|
|
|
62.300
|
|
|
|
|
|
62.805
|
| Flöha viaduct (344 m) | | (Flöha Valley Railway) |
|
|
|
|
|
|
|
|
|
|
|
|
km change -966 m
|
|
|
|
|
64.750
|
Falkenau (Sachs) Süd
|
310 m
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
67.370
|
Flöha
|
278 m
|
|
|
|
|
67.625
|
B 180 level crossing
|
|
|
|
|
68.079
|
|
|
|
|
|
70.130
|
Niederwiesa junction; sig box 1
|
|
|
|
|
70.170
|
|
|
|
|
|
|
|
|
|
|
|
71.280
|
Niederwiesa
|
291 m
|
|
|
|
|
73.620
|
Bk Ebersdorf
|
|
|
|
|
75.50
|
Bk Chemnitz-Hilbersdorf sig box A
|
|
|
|
|
|
km change (start of line 6257)
|
|
|
|
|
|
|
|
|
|
|
0.490
|
Chemnitz-Hilbersdorf
|
325 m
|
|
|
|
|
76.520
|
Chemnitz-Hilbersdorf
|
320 m
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
km change (end of line 6257)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
79.730
|
Chemnitz Hbf
|
302 m
|
|
|
|
|
|
|
|
|
|
|
81.820
|
Chemnitz Süd
|
312 m
|
|
|
|
|
|
|
|
|
|
|
82.630
|
Bk Chemnitz Süd
|
|
|
|
|
82.850
|
Chemnitz Mitte
|
307 m
|
|
|
|
|
83.480
|
Chemnitz-Kappel
|
310 m
|
|
|
|
|
85.530
|
Chemnitz-Schönau
|
320 m
|
|
|
|
|
85.900
|
Bk Schönau
|
|
|
|
|
|
|
|
|
|
|
88.010
|
Chemnitz-Siegmar
|
326 m
|
|
|
|
|
91.250
|
Grüna (Sachs)
|
350 m
|
|
|
|
|
|
from Limbach and from Küchwald
|
|
|
|
|
|
to Neuoelsnitz
|
|
|
|
|
94.310
|
Wüstenbrand
|
378 m
|
|
|
|
|
95.907
|
Bk Oberlungwitz
|
|
|
|
|
98.230
|
Hohenstein-Ernstthal
|
345 m
|
|
|
|
|
|
Interurban tramway to Oelsnitz
|
|
|
|
|
98.654
|
Hohenstein-Ernstthal–Oelsnitz tramway
|
|
|
|
|
99.700
|
Hüttengrund viaduct (150 m)
|
|
|
|
|
101.220
|
Bk Hermsdorf
|
|
|
|
|
|
from Stollberg (Sachs)
|
|
|
|
|
104.910
|
St. Egidien
|
283 m
|
|
|
|
|
107.762
|
Bk Lobsdorf
|
|
|
|
|
109.500
|
Bk Niederlungwitz
|
|
|
|
|
|
|
|
|
|
|
112.140
|
Glauchau (Sachs)
|
244 m
|
|
|
|
|
114.310
|
Bk Gesau
|
|
|
|
|
115.990
|
Glauchau-Schönbörnchen
|
258 m
|
|
|
|
|
|
|
|
|
|
|
|
Narrow gauge railway to Ortmannsdorf
|
|
|
|
|
120.540
|
Mosel
|
257
|
|
|
|
|
|
Industrial line to Zwickau
|
|
|
|
|
122.790
|
Oberrothenbach
|
265 m
|
|
|
|
|
125.830
|
Zwickau-Pölbitz
|
270 m
|
|
|
|
|
|
Industrial line from Mosel
|
|
|
|
|
|
|
|
|
|
|
128.350
|
Zwickau (Sachs) Hbf
|
|
|
|
|
130.950
|
"7. Oktober" depot
|
|
|
|
|
|
to Falkenstein (Vogtl.)
|
|
|
|
|
131.600
|
Bk Maxhütte
|
|
|
|
|
132.830
|
Lichtentanne (Sachs)
|
320 m
|
|
|
|
|
134.502
|
Bk Steinpleis
|
|
|
|
|
134.930
|
Steinpleis
|
310 m
|
|
|
|
|
135.626
|
Steinpleis Viaduct
|
|
|
|
|
135.700
|
|
|
|
|
|
|
|
|
|
|
|
136.260
|
Werdau wye (Neumark separation)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Source: German railway atlas
| |
|
| Freital Ost junction–Tharandt (freight railway) |
|---|
|
| Line number | 6259 |
|---|
| Locale | Saxony |
|---|
|
| Line length | 8.250 km (5.126 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Electrification | 15 kV/16.7 Hz AC overhead catenary |
|---|
| Operating speed | 70 km/h (43.5 mph) (maximum) |
|---|
|
|
|
|
|
|
|
|
from Dresden
|
|
|
|
|
5.558
|
to Tharandt (start of line)
|
|
|
|
|
5.680
|
Freital Ost junction (Bk) 155 m
|
|
|
|
|
|
kn change -12 m
|
|
|
|
|
6.844
|
Freital-Potschappel
|
162 m
|
|
|
|
|
|
narrow gauge line to Nossen and
|
|
|
|
|
|
Niederhermsdorf coal branch line
|
|
|
|
|
|
connecting line to Freital-Hainsberg
|
|
|
|
|
|
connecting line from Freital-Potschappel
|
|
|
|
|
10.092
|
Freital-Hainsberg
|
187 m
|
|
|
|
|
|
|
|
|
|
|
|
from Freital Ost
|
|
|
|
|
13.705
|
Tharandt
|
208 m
|
|
|
|
|
13.820
|
(end of line)
|
|
|
|
|
|
to Werdau
|
|
|
|
|
|
|
|
|
|
| Source: German railway atlas
| |
|
The Dresden–Werdau railway is an electrified, double-track main line in the German state of Saxony. It runs from Dresden via Freiberg, Chemnitz and Zwickau to Werdau wye, where it joins the Leipzig-Hof railway.
The line was opened in several sections and its first section from Werdau to Zwickau was opened 1845, making it one of the oldest railways in Germany. The Dresden–Tharandt section was completed in 1855, the Chemnitz–Zwickau section followed in 1858, the line was extended from Tharandt to Freiberg in 1862 and the section from Chemnitz to Flöha was opened as part of the line to Annaberg in 1866. The entire line was not open until 1869, when the missing section from Freiberg-Flöha was opened. From then on the railway line developed into an important connection. It continues to be an important part of the so-called Saxon-Franconian trunk line (German: Sachsen-Franken-Magistrale) from Dresden to Nuremberg.