Dongdaqiao station

Dongdaqiao

东大桥
Line 6 platform
Chinese name
Simplified Chinese东大桥站
Traditional Chinese東大橋站
Literal meaningEast Big Bridge Station
Transcriptions
Standard Mandarin
Hanyu PinyinDōng Dà Qiáo Zhàn
General information
LocationEast Workers' Stadium Road (工人体育场东路) / Dongdaqiao Road (东大桥路) and Chaoyangmen Outer Street / North Chaoyang Road (朝阳北路)
Chaoyang District, Beijing
China
Coordinates39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657
Operated byBeijing Mass Transit Railway Operation Corporation Limited (Lines 6, 22 and 28)
Beijing MTR (Line 17)
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 6: December 30, 2012 (2012-12-30)
  •      Line 17: December 27, 2025 (2025-12-27)
Services
Preceding station Beijing Subway Following station
Chaoyang Men
towards Jin'anqiao
Line 6 Hujialou
towards Luyang
Workers' Stadium Line 17 Yong'an Li
towards Jiahuihu
Future services
Terminus Pinggu line
Opening 2029
Jintai Xizhao
towards Pinggu
Line 28
Opening 2029
Jintai Xizhao
towards Guangqudonglu
Location
Dongdaqiao
Location in central Beijing

Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is an interchange station between Line 6 and Line 17 of the Beijing Subway. The Line 6 station opened on December 30, 2012, and the Line 17 station opened on December 27, 2025.