Yellow Line (Chennai Metro)

Yellow Line (Line 4)
Overview
Native nameMañjaḷ vaḻittaṭam
StatusUnder Construction
LocaleChennai, Tamil Nadu, India
Termini
Connecting linesOperational (3):
Blue Line Green Line  Chennai MRTS 
Upcoming (2):
Purple Line Red Line
Stations27
Websitechennaimetrorail.org
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Delhi Metro Rail Corporation
Depot(s)Poonamallee
Rolling stockAlstom
History
Planned openingJune 2026 (June 2026)
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km (6.3 mi) Underground
16 km (9.9 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
SignallingCBTC Signalling System
Route map

           Planned
High Court
State Secretariat
Anna Square
Marina Beach
Lighthouse
Kutchery Road
Thirumayilai Purple Line
Alwarpet
Bharathidasan Road
Boat Club
Nandanam on Blue Line
Nandanam
Panagal Park
Kodambakkam
Kodambakkam Powerhouse
Vadapalani on Green Line
Vadapalani
Saligramam
Saligramam Warehouse
Alwarthirunagar Red Line
Valasaravakkam Red Line
Karambakkam Red Line
Alapakkam Red Line
Porur Junction
Porur Bypass
Thelliyaragaram
Iyyapanthangal
Kattupakkam
Kumananchavadi
Karayanchavadi
Mullaithottam
Poonamallee
Poonamallee Depot
Poonamallee Bypass
           Planned
Nazarathpet
Chembarambakkam
Kuthambakkam Bus Terminus
Samathuvapuram
Chettipedu
Thandalam
Irungattukottai SIPCOT
Pennalur
Sriperumbudur
Pattunool Chatram
Irungulam Industrial Estate
Mambakkam
Tirumangalam
Sunguvarchatiram (RRTS )
Parandur RRTS

The Yellow Line or Line 4 is one of the under construction lines of Chennai Metro, stretching for 26.1 km (16.2 mi) between Lighthouse and Poonamallee Bypass. The line will consist of 27 stations, out of which nine will be underground and 18 will be at grade or elevated. The colour code of the corridor was changed from Orange to Yellow in 2025.