Xunfenggang station
Line 6 station exterior | |||||||||||||||
| Chinese name | |||||||||||||||
| Simplified Chinese | 浔峰岗站 | ||||||||||||||
| Traditional Chinese | 潯峰崗站 | ||||||||||||||
| Literal meaning | hill at the river's edge peak station | ||||||||||||||
| |||||||||||||||
| General information | |||||||||||||||
| Location | East side of the intersection of Jinshazhou Road (金沙洲路) and Xunfengshan East Road (浔峰山东路) Jinshazhou, Baiyun District, Guangzhou, Guangdong China | ||||||||||||||
| Coordinates | 23°10′0.10″N 113°11′47.31″E / 23.1666944°N 113.1964750°E | ||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||
| Lines | |||||||||||||||
| Platforms | 5 (1 island platform and 3 side platforms) | ||||||||||||||
| Tracks | 5 | ||||||||||||||
| Construction | |||||||||||||||
| Structure type | Elevated (Line 6) Underground (Line 12) | ||||||||||||||
| Accessible | Yes | ||||||||||||||
| Other information | |||||||||||||||
| Station code | 601 1201 | ||||||||||||||
| History | |||||||||||||||
| Opened | |||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
Xunfenggang Station (simplified Chinese: 浔峰岗站; traditional Chinese: 潯峰崗站; Jyutping: cam4 fung1 gong1 zaam6; Cantonese Yale: Chàhmfūnggōng Jaahm; lit. 'hill at the river's edge peak station') is an interchange station between Line 6 and Line 12 of the Guangzhou Metro, and serves as the western terminus for both lines. The Line 6 station started operations on 28 December 2013. It is located at the south of the area of Xunfenggang (浔峰岗), A1 Road, Jinshazhou, Baiyun District. The terminus approaches near Lishui, Nanhai District, Foshan, which is just over the hill next to the station. Line 12 opened at this station on 29 June 2025, thus becoming an interchange station.