Tianhe Park station

Tianhe Park

天河公园
Platform 1 (Line 11 Outer Circle platform)
Chinese name
Simplified Chinese天河公园站
Traditional Chinese天河公園站
Transcriptions
Standard Mandarin
Hanyu PinyinTiānhé Gōngyuán Zhàn
Yue: Cantonese
Yale RomanizationTīnhòh Gūng'yún Jaahm
JyutpingTin1ho4 Gung1jyun4 Zaam6
General information
LocationTianhe Park, northeast side of intsersection of Huangpu Avenue (黄埔大道) and Tianfu Road (天府路), Tianyuan Subdistrict
Tianhe District, Guangzhou, Guangdong
China
Coordinates23°7′52″N 113°21′36″E / 23.13111°N 113.36000°E / 23.13111; 113.36000
Operated byGuangzhou Metro Co. Ltd.
Lines
Platforms8 (3 island platforms and 2 side platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code1104 1320 2102
History
Opened
  •      Line 21: 20 December 2019 (2019-12-20)
  •      Line 11: 28 December 2024 (2024-12-28)
  •      Line 13: 29 September 2025 (2025-09-29)
Services
Preceding station Guangzhou Metro Following station
Huajing Road
Outer Circle
Line 11 Yuancun
Inner Circle
Terminus Line 13 Tangxia
towards Xinsha
Line 21 Tangdong
Future services (2026)
Baimagang
towards Chaoyang
Line 13 Tangxia
towards Xinsha
Location

Tianhe Park station (simplified Chinese: 天河公园站; traditional Chinese: 天河公園站; pinyin: Tiānhé Gōngyuán Zhàn; Cantonese Yale: Tīnhòh Gūng'yún Jaahm) is an interchange station between Line 11, Line 13 and Line 21 of the Guangzhou Metro, and the western terminus of Line 13 and Line 21. It started operations on 20 December 2019. With the opening of Line 11, Line 21 was truncated to here from Yuancun since 2 October 2024, as to allow renovation works in preparation for Line 11 trains to serve that station instead. Line 11 started serving this station on 28 December 2024.

Prior to the opening of Line 11, the dismantling work of the section from this station to Yuancun of Line 21 began on 2 October 2024. The southern terminus of Line 21 was adjusted north to this station, and platforms 3 and 4 on the inner platforms were put in use, whilst platforms 1 and 2 on the outer platforms were temporarily suspended. The 6B train type's shielding doors and glass panel false walls of the outer platform were removed, and then the appropriate shielding doors of the 8A train type were installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Yuancun station area and replace the signal system to Line 11 standards.

The station became a three-line transfer station when Line 13 started operations on 29 September 2025, serving as its interim western terminus.