Tianhe Park station
Platform 1 (Line 11 Outer Circle platform) | ||||||||||||||||||||||||||||||
| Chinese name | ||||||||||||||||||||||||||||||
| Simplified Chinese | 天河公园站 | |||||||||||||||||||||||||||||
| Traditional Chinese | 天河公園站 | |||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
| General information | ||||||||||||||||||||||||||||||
| Location | Tianhe Park, northeast side of intsersection of Huangpu Avenue (黄埔大道) and Tianfu Road (天府路), Tianyuan Subdistrict Tianhe District, Guangzhou, Guangdong China | |||||||||||||||||||||||||||||
| Coordinates | 23°7′52″N 113°21′36″E / 23.13111°N 113.36000°E | |||||||||||||||||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||||||||||||||||
| Lines | ||||||||||||||||||||||||||||||
| Platforms | 8 (3 island platforms and 2 side platforms) | |||||||||||||||||||||||||||||
| Tracks | 6 | |||||||||||||||||||||||||||||
| Construction | ||||||||||||||||||||||||||||||
| Structure type | Underground | |||||||||||||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||||||||
| Station code | 1104 1320 2102 | |||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||
| Opened | ||||||||||||||||||||||||||||||
| Services | ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
Tianhe Park station (simplified Chinese: 天河公园站; traditional Chinese: 天河公園站; pinyin: Tiānhé Gōngyuán Zhàn; Cantonese Yale: Tīnhòh Gūng'yún Jaahm) is an interchange station between Line 11, Line 13 and Line 21 of the Guangzhou Metro, and the western terminus of Line 13 and Line 21. It started operations on 20 December 2019. With the opening of Line 11, Line 21 was truncated to here from Yuancun since 2 October 2024, as to allow renovation works in preparation for Line 11 trains to serve that station instead. Line 11 started serving this station on 28 December 2024.
Prior to the opening of Line 11, the dismantling work of the section from this station to Yuancun of Line 21 began on 2 October 2024. The southern terminus of Line 21 was adjusted north to this station, and platforms 3 and 4 on the inner platforms were put in use, whilst platforms 1 and 2 on the outer platforms were temporarily suspended. The 6B train type's shielding doors and glass panel false walls of the outer platform were removed, and then the appropriate shielding doors of the 8A train type were installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Yuancun station area and replace the signal system to Line 11 standards.
The station became a three-line transfer station when Line 13 started operations on 29 September 2025, serving as its interim western terminus.