Tábor–Bechyně railway

Tábor–Bechyně railway
A ČD 100 class locomotive at Bežerovice
Overview
Statusopen
OwnerSpráva železniční dopravní cesty
Termini
Stations13
Service
Route number202
Operator(s)České dráhy
Rolling stockČD Class 814
ČD Class 113
ČD Class 100
kkStB 40.0
History
Opened21 June 1903 (1903-06-21)
Technical
Line length24 km (15 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1500V DC
Operating speed60 kilometres per hour (37 mph)
Route map

Tábor
Horky u Tábora
Slapy
Libějice
Malšice
Čenkov u Malšic
Třebelice
Všechlapy
Bechyně
military airfield
Bežerovice
Bechyně zastávka
Bechyně Bridge
across Lužnice river
Bechyně

The Tábor–Bechyně railway was the first electrified railway line in the Czech Republic, opening in 1903.