Sherwin-Williams Headquarters
| Sherwin-Williams Headquarters | |
|---|---|
Sherwin-Williams Headquarters in 2025 | |
Interactive map of the Sherwin-Williams Headquarters area | |
| General information | |
| Status | Topped-out |
| Type | Office |
| Location | 1426 West 3rd Street |
| Coordinates | 41°29′57″N 81°41′46″W / 41.49917°N 81.69611°W |
| Current tenants | Sherwin-Williams |
| Construction started | 2022 |
| Completed | 2024 |
| Height | |
| Height | 616 ft (188 m) |
| Technical details | |
| Floor count | 36 |
| Design and construction | |
| Architect | Pickard Chilton |
| Civil engineer | Osborn Engineering |
Preview warning: Page using Template:Infobox building with deprecated parameter "start_date". Replace with "construction_start_date".
Preview warning: Page using Template:Infobox building with deprecated parameter "caption". Replace with "image_caption".
The Sherwin-Williams Headquarters is a 36-story office tower under construction in downtown Cleveland, Ohio, United States. At 616 ft (188 m), it is the fourth-tallest building in Cleveland and the sixth-tallest building in Ohio. When completed, it will be the global headquarters of Sherwin-Williams, the largest paint and coating company in the world. The headquarters complex faces Public Square and covers portions of three city blocks. The complex includes the primary tower, a parking garage, and a pavilion, with hints of possible future expansion within the remainder of the lots.