Probolinggo–Banyuwangi Toll Road
Probolinggo–Banyuwangi Toll Road | |
|---|---|
| Jalan Tol Probolinggo–Banyuwangi | |
| Probowangi Toll Road | |
| Route information | |
| Part of AH2 | |
| Maintained by PT Jasa Marga Probolinggo Banyuwangi (JPB) | |
| Length | 163.83 km (101.80 mi) |
| Status | Under construction |
| Major junctions | |
| Northwest end | Probolinggo |
| AH2 – Pasuruan–Probolinggo Toll Road | |
| Southeast end | Port of Ketapang |
| Location | |
| Country | Indonesia |
| Provinces | East Java |
| Major cities | |
| Highway system | |
Probolinggo–Banyuwangi Toll Road (Probowangi Toll Road) is a controlled-access toll road in East Java. The toll road will connect Probolinggo Regency, Situbondo Regency and Banyuwangi Regency. The toll road will be integrated with Port of Ketapang to allow crossing from Java to Bali. The toll road is the final phase of Trans-Java Toll Road with Port of Merak on the western end. It is currently under route planning phase, but the construction of the first phase of this toll road was expected to be operational around 2024.