Parijaata line
| Parijaata line | |||
|---|---|---|---|
| Overview | |||
| Native name | Pārijāta mārga | ||
| Owner | Rail Infrastructure Development Company (Karnataka) Limited K-RIDE | ||
| Termini | |||
| Stations | 14 | ||
| Service | |||
| Type | Commuter rail | ||
| Operator(s) | Rail Infrastructure Development Company (Karnataka) Limited K-RIDE | ||
| Depot(s) | TBD | ||
| History | |||
| Planned opening | June 2029 | ||
| Technical | |||
| Line length | 35.52 km (22.07 mi) | ||
| Number of tracks | Double-track | ||
| Character | Elevated and at-grade | ||
| Track gauge | 5 ft 6 in (1,676 mm) broad gauge | ||
| Electrification | 25 kV 50 Hz AC overhead catenary | ||
| |||
The Parijaata line is a planned Bengaluru Suburban rail line between Kengeri and Whitefield, in India. The 35 km (22 mi) long broad-gauge line was approved in 2019. The line which is also referred as 'corridor-3' is awaiting for construction works. It is named after the flower Parijaata (Nyctanthes arbor-tristis) in Kannada.