Next Generation Launch Vehicle

Next Generation Launch Vehicle
NGLV, NGLV-H and NGLV-SH
FunctionMedium to Heavy-lift launch vehicle
ManufacturerISRO
Country of originIndia
Size
Height93 m (305 ft)
Width6.5 m (21 ft)
Mass600 t (590 long tons; 660 short tons) to 1,094 t (1,077 long tons; 1,206 short tons)
Booster stage – S200 Boosters (NGLV-H)
Height25 m (82 ft)
Diameter3.2 m (10 ft)
Empty mass31,000 kg (68,000 lb) each
Gross mass236,000 kg (520,000 lb) each
Propellant mass205,000 kg (452,000 lb) each
Powered bySolid S200
Maximum thrust5,151 kN (525.3 tf)
Specific impulse274.5 seconds (2.692 km/s) (vacuum)
Burn time128 s
PropellantHTPB / AP
First stage – LM470 Core (NGLV/NGLV-H)
Diameter6.5 m (21 ft)
Propellant mass470 t (1,040,000 lb)
Powered by9 LME-110
PropellantLOX / CH4
Second stage – LM120 (NGLV/NGLV-H)
Diameter6.5 m (21 ft)
Propellant mass120 t (260,000 lb)
Powered by2 LME-110
PropellantLOX / CH4
Third stage – C32 (NGLV/NGLV-H)
Diameter6.5 m (21 ft)
Propellant mass32 t (71,000 lb)
Powered by1 CE-20
Maximum thrust216 kN (22.0 tf)
Specific impulse443 seconds (4.34 km/s)
PropellantLOX / LH2
Stages3
Capacity
Payload to LEO
MassNGLV: 14 t (31,000 lb) (Reused)
20 t (44,000 lb) (Expended)
NGLV-H: 30 t (66,000 lb)
Payload to GTO
MassNGLV: 5 t (11,000 lb) (Reused)
9 t (20,000 lb) (Expended)
NGLV-H: 12 t (26,000 lb)
Payload to TLI
MassNGLV: 7 t (15,000 lb)
NGLV-H: 10 t (22,000 lb)
Associated rockets
Comparable
Launch history
StatusUnder development
Launch sitesSDSC TLP
First flight2031 (planned)
Carries passengers or cargo

The Next Generation Launch Vehicle (NGLV) is a family of three-stage partially reusable medium to super heavy-lift launch vehicle, currently under development by ISRO. The family of these vehicles are designed to replace currently operational systems like the PSLV and GSLV. Previously referred to as Unified Launch Vehicle (ULV), the project is now being called as Project Soorya.

This family of three launchers were previously being designed for replacing the different core propulsion modules of PSLV, GSLV, and LVM3 respectively with a common semi-cryogenic engine and hence it was named as ULV. The initial proposals were planned to be expendable. But the new (Oct 2022) proposals under the name of NGLV suggests launchers having partial reusability.

S. Sivakumar is the program director for ISRO's Space Transportation System and the projector director for NGLV at the Vikram Sarabhai Space Centre (VSSC). The development of the NGLV is projected to be 8 years from December 2024.

In an interview, the former Chairman of ISRO S. Somanath stated that after the integration of the NGLV, all other launch vehicles will be retired, except the LVM3 and the SSLV.