Mallige line

Mallige line
Overview
Native nameಮಲ್ಲಿಗೆ ಮಾರ್ಗ
OwnerRail Infrastructure Development Company (Karnataka) Limited K-RIDE
Termini
Stations16
Service
TypeCommuter rail
Operator(s)Rail Infrastructure Development Company (Karnataka) Limited K-RIDE
Depot(s)Soladevanahalli
History
Planned openingMarch 2027 (March 2027)
Technical
Line length28.72 km (17.85 mi)
Number of tracksDouble-track
CharacterElevated and at-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Towards Tumakuru
26.883
Soladevanahalli
Soladevanahalli depot
24.458
Chikkabanavara
23.259
Myadarahallli
20.327
Shettyhalli
18.972
Jalahalli
15.924
Yeshwanthpur
Sampige line
Towards KSR Bengaluru/ Mysuru
Towards Devanahalli
15.683
Mathikere
13.455
Lottegollahalli
10.927
Hebbal
8.582
Kanakanagara
7.133
Nagawara
5.400
Kaverinagara
4.152
Banaswadi
3.095
Sevanagara
1.053
Kasturinagara
0.587
Benniganahalli
Kanaka line towards Rajanukunte
towards Heelalige

The Mallige line is an under-construction Bengaluru Suburban rail line between Benniganahalli to Chikkabanavara. The 27 km (17 mi) long broad-gauge line was approved in 2019 with its construction works commencing in 2022. The line which is also referred as 'corridor-2' is being built in two packages C2A and C2B respectively. The C1A package consists eight stations, while the C1B has four. The line is named after the flower Mallige (Jasmine) in Kannada.