MRTC 3100 class
| MRTC 3100 class | |
|---|---|
A 3100 class (8MLB) train in a three-car formation at North Avenue station | |
Train interior in July 2025 | |
| Stock type | Light rail vehicle |
| In service | 2016 2018–2019 2020–2021 2022 2025–present |
| Manufacturer | CNR/CRRC Dalian |
| Assembly | Dalian, Liaoning, China |
| Order no. | LOT1 |
| Constructed | 2015–2017 |
| Entered service | May 7, 2016 |
| Number built | 48 vehicles |
| Number in service | 3 vehicles (1 set) |
| Formation | 3/4 cars per trainset |
| Design code | 8MLB |
| Fleet numbers | 3101–3148 |
| Capacity | 394 per car (74 seats) 1,182–1,576 per train |
| Operator | Department of Transportation |
| Depot | North Avenue |
| Line served | 3 Line 3 |
| Specifications | |
| Car body construction | Stainless steel |
| Train length | 95.16 m (312 ft 2+29⁄64 in) (3 cars) 126.88 m (416 ft 3+9⁄32 in) (4 cars) |
| Car length | 31.72 m (104 ft 13⁄16 in) |
| Width | 2.5 m (8 ft 2+27⁄64 in) |
| Height | 3.73 m (12 ft 2+27⁄32 in) |
| Floor height | 0.925 m (3 ft 27⁄64 in) |
| Platform height | 0.9 m (2 ft 11+7⁄16 in) |
| Doors | Double-leaf plug-type; 5 per side
|
| Articulated sections | 3 |
| Wheel diameter | 700–595 mm (28–23 in) (new–worn) |
| Wheelbase | 1.9 m (6 ft 2+51⁄64 in) |
| Maximum speed | 65 km/h (40 mph) (design) 60 km/h (37 mph) (service) |
| Weight | 49.7 t (110,000 lb) (tare) 75.2 t (166,000 lb) (laden) |
| Axle load | 9.4 t (21,000 lb) |
| Steep gradient | 4–5% |
| Traction system | Voith IGBT–VVVF |
| Traction motors | 4 × Traktionssysteme Austria TMR 36-28-4 120 kW (160 hp) 3-phase AC induction (1 hour rating: 477 V 186 A 2379 rpm) |
| Power output |
|
| Transmission | Quill drive |
| Acceleration | 1.03 m/s2 (3.4 ft/s2) |
| Deceleration | 1.1 m/s2 (3.6 ft/s2) (service) 1.5 m/s2 (4.9 ft/s2) (emergency) |
| Auxiliaries | Static converter |
| HVAC | ShiJiaZhuang King roof-mounted duct-type air-conditioning |
| Electric systems | 750 V DC overhead catenary |
| Current collection | Single-arm pantograph |
| UIC classification | Bo′+2′+2′+Bo′ |
| Bogies | Inside frame-type |
| Minimum turning radius | 25 m (82 ft) |
| Braking systems | Knorr-Bremse regenerative and rheostatic |
| Safety systems | Alstom CITYFLO 250 fixed block with subsystems of EBICAB 900 ATP, EBI Screen 900 CTC, and EBI Lock 950 CBI |
| Coupling system | Scharfenberg Type 330 |
| Headlight type | LED lamp |
| Seating | Longitudinal |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Notes/references | |
| Sourced from unless otherwise noted. | |
The MRTC 3100 class or CRRC Dalian 8MLB LRV is the class of second-generation uni-directional light rail vehicles (LRVs) built by CRRC Dalian. Owned by the Philippine government and operated by the Department of Transportation (DOTr), these are used on Line 3 of the Manila Metro Rail Transit System since 2016.
The trains were involved in legal issues and numerous controversies owing to its weight and incompatibility with the existing system, which the Metro Rail Transit Corporation (MRTC) raised that same year. The trains remained idle as these issues persisted, but in 2018, limited deployment commenced. It was repeatedly pulled from service and deployed erratically between 2019 and 2022, before being revived for regular operations in 2025.