Line F (Buenos Aires Underground)
| Line F | |
|---|---|
Network with line F, H and I complete | |
| Overview | |
| Status | In development |
| Termini |
|
| Stations | 12 (in the first stsge) |
| Service | |
| Type | Rapid transit |
| System | Buenos Aires Underground |
| Operator(s) | Metrovías |
| History | |
| Opened | After 2031 (planned) |
| Technical | |
| Line length | 8.6km |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line F is a planned addition to the Buenos Aires Underground. In 2019, the government of Buenos Aires was looking for a group to create a plan of the line, but this study was cancelled in 2022. The city decided to create a study with their own staff, which is still underway as of 2024. The estimated cost of the project has risen from 800 million dollars, to 2 billion USD. The layout, developed in two stages, will connect with all existing Underground lines, seek to alleviate congestion on Line C, and improve connectivity between the south and north of the city. The inauguration of the first section is scheduled for 2031 or later, with construction to begin in 2026.