Line 7 (Tianjin Metro)

Line 7
Line 7 train leaving Gulou station
Overview
StatusOperational
OwnerCREC (Tianjin) Rail Transport Investment & Construction Co., Ltd.
LocaleTianjin, China
Termini
Stations15
Service
TypeRapid transit
SystemTianjin Metro
Operator(s)CREC (Tianjin) Rail Transport Investment & Construction Co., Ltd.
Rolling stock6-car type A
History
Opened28 September 2025 (2025-09-28)
Technical
Line length21.82 km (13.56 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1,500 V DC Overhead catenary
Operating speed80 km/h (50 mph) (Maximum design speed)

Line 7 of Tianjin Metro is a metro line in Tianjin, China. This is the first line of Tianjin Metro system operating under PPP contract.

Line 7 has a total length of 42.53 kilometers, from Beichen District High-speed Railway North Xincheng Station to Xiqing District Saida Bazhi Road Station. The first phase of the project has a total length of 26.53km, 21 stations, and an estimated investment of 26.897 billion RMB, of which 19.681 billion RMB is included in the scope of PPP projects, of which the project cost is about 14.651 billion RMB.

On 28 September 2025 at 6:17 am, the southern section of Line 7 from Saidalu to Gulou with 15 stations officially put into operation .