Line 7 (Ningbo Rail Transit)
| Line 7 | |
|---|---|
Line 7 train | |
| Overview | |
| Status | Operational |
| Owner | Ningbo Rail Transit Group Co., Ltd |
| Locale | Ningbo, Zhejiang, China |
| Termini |
|
| Stations | 25 |
| Service | |
| Type | Rapid transit |
| System | Ningbo Rail Transit |
| Operator(s) | Ningbo Rail Transit Group Co., Ltd |
| Depot(s) | Xiayingnan depot, Lianqun Parking lot |
| Rolling stock | 6-car type B adopts GoA4 automation level |
| History | |
| Opened | 29 August 2025 |
| Technical | |
| Line length | 39.4 km (24.5 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1,500 V DC Overhead catenary |
| Operating speed | 100 km/h (62 mph) (Maximum design speed) |
The Line 7 of Ningbo Rail Transit (Chinese: 宁波轨道交通7号线) is a rapid transit line served Ningbo, Zhejiang, China.
The National Development and Reform Commission (NDRC) was aprroved the Ningbo Urban Rail Transit Phase III Construction Plan (2021–2026) plans to construct five projects in 2020: Phase I of Line 6, Line 7; Phase I of Line 8, the western extension of Line 1, and the extension of Line 4. Construction of the first station on Line 7 began on 15 July 2021 and construction of entired line began on 5 January 2022 with total project investment is 33.89 billion RMB.