Line 7 (Ningbo Rail Transit)

Line 7
Line 7 train
Overview
StatusOperational
OwnerNingbo Rail Transit Group Co., Ltd
LocaleNingbo, Zhejiang, China
Termini
  • Yunlong
  • Yufan
Stations25
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Group Co., Ltd
Depot(s)Xiayingnan depot, Lianqun Parking lot
Rolling stock6-car type B adopts GoA4 automation level
History
Opened29 August 2025 (2025-08-29)
Technical
Line length39.4 km (24.5 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1,500 V DC Overhead catenary
Operating speed100 km/h (62 mph) (Maximum design speed)

The Line 7 of Ningbo Rail Transit (Chinese: 宁波轨道交通7号线) is a rapid transit line served Ningbo, Zhejiang, China.

The National Development and Reform Commission (NDRC) was aprroved the Ningbo Urban Rail Transit Phase III Construction Plan (2021–2026) plans to construct five projects in 2020: Phase I of Line 6, Line 7; Phase I of Line 8, the western extension of Line 1, and the extension of Line 4. Construction of the first station on Line 7 began on 15 July 2021 and construction of entired line began on 5 January 2022 with total project investment is 33.89 billion RMB.