Line 6 (Hefei Metro)
| Line 6 | |
|---|---|
| 6 | |
Zhugang Station platform | |
| Overview | |
| Native name | 合肥轨道交通6号线 |
| Status | Operational |
| Owner | Hefei Rail Transit |
| Locale | Hefei, Anhui, China |
| Termini |
|
| Stations | 22 (21 in operation) |
| Service | |
| Type | Rapid transit |
| System | Hefei Metro |
| Operator(s) | Hefei Rail Transit |
| Depot(s) | Shi Boguwan Depot, Longtang Parking lot |
| Rolling stock | 6-car type B |
| History | |
| Opened | 26 December 2025 |
| Technical | |
| Line length | 34.43 km (21.39 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead catenary, 1,500 V DC |
| Operating speed | 100 km/h (62 mph) (Maximum design speed) |
Line 6 of Hefei Metro (Chinese: 合肥轨道交通6号线) is the seventh metro line in operation of Hefei Metro system. Construction started on 31 October 2020 with an investment of 20.585 billion RMB, the first phase opened on 26 December 2025 at 10:00 am with 21 stations in operation, spanning 34.43 km long. As the second line of Hefei Metro system, and also in Anhui province that is a fully automated line (after Line 8), Line 6 adopts GoA4 automation level, which has the highest automation level in the world.