Line 6 (Hefei Metro)

Line 6
 6 
Zhugang Station platform
Overview
Native name合肥轨道交通6号线
StatusOperational
OwnerHefei Rail Transit
LocaleHefei, Anhui, China
Termini
  • Longtang
  • Qinglonggang
Stations22 (21 in operation)
Service
TypeRapid transit
SystemHefei Metro
Operator(s)Hefei Rail Transit
Depot(s)Shi Boguwan Depot, Longtang Parking lot
Rolling stock6-car type B
History
Opened26 December 2025 (2025-12-26)
Technical
Line length34.43 km (21.39 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary, 1,500 V DC
Operating speed100 km/h (62 mph) (Maximum design speed)

Line 6 of Hefei Metro (Chinese: 合肥轨道交通6号线) is the seventh metro line in operation of Hefei Metro system. Construction started on 31 October 2020 with an investment of 20.585 billion RMB, the first phase opened on 26 December 2025 at 10:00 am with 21 stations in operation, spanning 34.43 km long. As the second line of Hefei Metro system, and also in Anhui province that is a fully automated line (after Line 8), Line 6 adopts GoA4 automation level, which has the highest automation level in the world.