Line 3 (Zhengzhou Metro)
| Line 3 | |
|---|---|
| 3 | |
Train 0312 approaching Haitansi station | |
| Overview | |
| Status | Operating |
| Owner | Zhengzhou |
| Locale | Zhengzhou, Henan, China |
| Termini |
|
| Stations | 25 |
| Service | |
| Type | Rapid transit |
| System | Zhengzhou Metro |
| Operator(s) | Zhengzhou China Construction Shenzhen Railway Rail Transit Co., Ltd (A joint venture between China State Construction Engineering, Shenzhen Metro Group and Zhengzhou Jiaotong Investment.) |
| History | |
| Opened | 26 December 2020 |
| Technical | |
| Line length | 31.804 km (19.762 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead lines (1500 volts) |
Line 3 of Zhengzhou Metro (Chinese: 郑州地铁3号线; pinyin: zhèngzhōu dìtiě sānhào xiàn) is a rapid transit line in Zhengzhou that runs in a northwest - southeast direction. The line uses six car Type A trains. The line opened on December 26, 2020.
Line 3 is operated by Zhengzhou China Construction Shenzhen Railway Rail Transit Co., Ltd (A joint venture between China State Construction Engineering, Shenzhen Metro Group and Zhengzhou Jiaotong Investment) with a registered capital of 1 billion RMB. The company was established on December 26, 2018; mainly responsible for the investment, financing, construction, operation and maintenance of Line 3.