Line 1 (Dongguan Rail Transit)

Line 1
 1 
Line 1 train entering Houde station
Overview
Other nameR1
StatusIn operation
LocaleDongguan, Guangdong
Termini
Stations25 (Phase 1)
Service
TypeRapid transit
SystemDongguan Rail Transit
Operator(s)Dongguan Rail Transit Corporation, Limited (东莞市轨道交通有限公司)
History
Opened28 November 2025 (2025-11-28)
Technical
Line length57.46 km (35.70 mi) (Phase 1)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 1 of the Dongguan Rail Transit (Chinese: 东莞轨道交通1号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Yī Hào Xiàn), is a rapid transit line in operation in Dongguan, Guangdong. Phase 1 of Line 1 connects Dongguanxi Railway Station in the North with Meitang in the south. It is 57.46 km in length (including 49.44 km underground section).

The Phase 1 of Line 1 in Dongguan started construction in September 2018. The five-station extension to Huangpu New Port station has not yet been approved by National Development and Reform Commission and has no published timeline.