Line 19 (Shanghai Metro)

Line 19
 19 
Overview
Other nameM9 (planned name)
Native name上海地铁19号线
StatusUnder construction
LocaleBaoshan, Jing'an, Hongkou, Pudong, Xuhui, Minhang
Shanghai
Termini
  • Baoshan Railway Station
  • Hongjian Road
Connecting lines 2   4   6   7   8   9   10   11   12   13   14   15   18   20   23 
Stations34
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
Operator(s)TBA
Depot(s)Chengjiang Road Depot
Tieshan Road Yard
Rolling stockClass A 6-car trains
History
Planned opening30 December 2027 (2027-12-30)
Technical
Track length46.2 km (28.7 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)

Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.

The line was announced by the Municipal government in 2016 and is planned to finish construction and open between Baoshan Railway Station and Yierba Jinian Road on 30 December 2027. The south section between Hongjian Road and Houtan is planned to finish construction in 2029, and the middle section between Houtan and Yierba Jinian Road in 2032.