Line 18 (Shanghai Metro)

Line 18
An 18A01 train at Hangtou station
Overview
Other nameL5 (planned name)
Native name上海地铁18号线
StatusOperational
OwnerShanghai Rail Transit Line 18 Development Co., Ltd.
LocaleBaoshan, Yangpu and Pudong districts, Shanghai, China
Termini
Stations31
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
ServicesMainline: Kangwen RoadHangtou
Partial mainline: South Changjiang RoadShenmei Road
Operator(s)Shanghai Maglev Transportation Development Co.,
Depot(s)Hangtou Depot
Rolling stock18A01
18A02
History
CommencedMay 12, 2016 (2016-05-12)
OpenedDecember 26, 2020 (2020-12-26)
Last extensionDecember 27, 2025 (2025-12-27)
Technical
Line length44.815 km (27.847 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines 1.5kV DC
Operating speed80 km (50 mi)
Average speed: 38.4 km (24 mi)
SignallingGoA4 / UTO
Alstom Urbalis 888 CBTC
Route map
To scale geographic map:

Line 18 is a north–south Shanghai Metro line running from South Changjiang Road station in the city's Baoshan District to Hangtou station in Pudong, with a length of 36.13 km (22.45 mi). The line was originally scheduled to open by the end of 2020. However, officials announced that only the initial segment of eight stations in Pudong started test runs in September 2020. The 14.5 km (9.0 mi) southern section opened for passenger operations on December 26, 2020. The remainder of the line was opened on 30 December 2021. The line is 44.8 km (27.8 mi) long with 31 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 15. The line is colored tan on system maps.