Kwu Tung station

Kwu Tung

古洞
Cut-and-cover construction of Kwu Tung station (January 2005) during the building of the Lok Ma Chau spur line
Chinese name
Chinese古洞
Literal meaningAncient Cave
Transcriptions
Standard Mandarin
Hanyu PinyinGǔdòng
Yue: Cantonese
Jyutpinggu2 dung6
General information
LocationHo Sheung Heung Road × Ma Tso Lung Road, Kwu Tung
North District, Hong Kong
Coordinates22°30′27″N 114°05′59″E / 22.50752°N 114.09962°E / 22.50752; 114.09962
ElevationUnderground
SystemFuture MTR rapid transit station
(Construction began in September 2023)
Owned byKowloon-Canton Railway Corporation
Operated byMTR Corporation
Lines
Platforms2 (1 island platform)
Tracks2
Connections
Construction
Structure typeUnderground
Platform levels1
Other information
Station codeKTU
WebsiteKwu Tung Station
History
OpeningExpected: 2027
Electrified25 kV 50 Hz AC (Overhead line)
Key dates
2021Planning and design commences
2022Project gazetted under the Railway Ordinance
2023Commencement of construction
2027Expected completion of construction
Services
Preceding station MTR Following station
Future services (2027)
Sheung Shui
towards Admiralty
East Rail line Lok Ma Chau
Terminus
Future service (2034)
San Tin Northern Link Terminus
Location
Kwu Tung
Location within the MTR system

Kwu Tung (Chinese: 古洞站) is an underground infill station currently under construction. It is situated on the Lok Ma Chau spur line of the East Rail line of the MTR rapid transit network in Hong Kong. The station will be situated near Kwu Tung in North District, New Territories.

It is part of the first phase of the Northern Link and act as its eastern terminus when phase 2 is completed, with an expected construction cost of HK$5.9 billion as of July 2023.