Jamuna Railway Bridge
Jamuna Railway Bridge যমুনা রেল সেতু | |
|---|---|
Jamuna Railway Bridge | |
| Coordinates | 24°24′09″N 89°46′05″E / 24.4026°N 89.7681°E |
| Carries | Jamtoil–Joydebpur line Dual Gauge railway line |
| Crosses | Jamuna River |
| Locale | Sirajganj, & Tangail Bangladesh |
| Official name | Jamuna Railway Bridge |
| Other name | Jamuna Rail Bridge |
| Owner | Bangladesh Railway |
| Next upstream | Naranarayan Setu |
| Next downstream | Jamuna Bridge |
| Characteristics | |
| Total length | 4.8 kilometres (3 mi) |
| Rail characteristics | |
| Track gauge | Dual Gauge |
| History | |
| Construction start | August 1, 2020 |
| Construction end | November 26, 2024 |
| Opened | March 18, 2025 |
| Location | |
Interactive map of Jamuna Railway Bridge | |
The Jamuna Railway Bridge is a dual-gauge, double-track railway bridge on Jamuna River in Bangladesh. This bridge connects Sirajganj and Tangail by railway network. This bridge is the longest solo railway bridge in Bangladesh.