Isimba Hydroelectric Power Station
| Isimba Hydroelectric Power Station | |
|---|---|
Isimba Hydroelectric Power Station Map of Uganda showing the location of Isimba. Isimba Hydroelectric Power Station Isimba Hydroelectric Power Station (Africa) Isimba Hydroelectric Power Station Isimba Hydroelectric Power Station (Earth) | |
| Country | Uganda |
| Location | Isimba, Kamuli District |
| Coordinates | 00°46′18″N 33°02′32″E / 0.77167°N 33.04222°E |
| Purpose | Power |
| Status | Operational |
| Opening date | 21 March 2019 |
| Construction cost | US$567.7 million |
| Owner | Government of Uganda |
| Operator | Uganda Electricity Generation Company Limited |
| Dam and spillways | |
| Impounds | Victoria Nile |
| Power Station | |
| Commission date | 21 March 2019 |
| Turbines | 4 x 45.8 MW |
| Installed capacity | 183.2 megawatts (245,700 hp) |
| Annual generation | 1,039 GWh |
Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.