Hudson's Detroit
| Hudson's Detroit | |
|---|---|
Hudson's Detroit in January 2026 | |
Interactive map of the Hudson's Detroit area | |
| General information | |
| Status | Completed |
| Location | 1208 Woodward Avenue, Detroit, MI 48226 |
| Coordinates | 42°20′02″N 83°02′53″W / 42.33389°N 83.04809°W |
| Construction started | December 14, 2017 |
| Topped-out | April 10, 2024 |
| Completed | August 22, 2025 |
| Cost | $1.4 billion |
| Owner | Bedrock Detroit |
| Height | |
| Height | 208.9 meters (685.4 ft) (Tower) |
| Technical details | |
| Floor count | 49 (Tower) 12 (Block Building) |
| Floor area | 130,064 m2 (1,400,000 sq ft) |
| Design and construction | |
| Architects | SHoP Architects Hamilton Anderson Associates |
| Developer | Bedrock Detroit |
| Main contractor | Barton Malow |
| Other information | |
| Public transit access | Cadillac Center QLine Campus Martius DDOT 4 |
| Website | |
| https://www.hudsons-detroit.com/ | |
Hudson's Detroit is a landmark mixed-use building complex in downtown Detroit, Michigan, United States. It includes a 49-story, 681-foot (208 m) skyscraper, with a hotel and condominiums, and a 12-story, 232-foot (71 m) mid-rise building, containing commercial offices, retail space, and a conference center. The taller tower is the second-tallest building in Detroit as well as in Michigan, and is the first skyscraper taller than 500 feet (150 m) to be built in Detroit in the 21st century. The shorter building was completed in 2025.