Hitchin Flyover

Hitchin Flyover
A Thameslink Class 700 crossing the flyover
Coordinates51°58′12″N 0°15′49″W / 51.96993°N 0.26355°W / 51.96993; -0.26355
CarriesDown Cambridge Flyover line
CrossesEast Coast Main Line
Named forHitchin
Characteristics
No. of lanesSingle track
History
Built2011–2013
OpenedJune 2013
Location
Interactive map of Hitchin Flyover

The Hitchin Flyover is a grade-separated single-track railway viaduct near Hitchin, Hertfordshire, England, which carries the Down Cambridge Flyover line over the East Coast Main Line. Constructed between 2012 and 2013, it connects the westernmost track of the East Coast Main Line with the Cambridge line. The flyover was built to increase the throughput at Cambridge Junction, a congested flat junction, which put severe constraints on capacity on both lines.