| Heuberg Railway |
|---|
|
|
| Native name | Heubergbahn |
|---|
| Line number | 4601 |
|---|
| Locale | Baden-Württemberg, Germany |
|---|
| Termini | |
|---|
|
| Route number | 274d / 318g / 308c |
|---|
|
| Opened | 1928 |
|---|
| Closed | 1966 |
|---|
|
| Line length | 17.9 km (11.1 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Old gauge | narrow gauge |
|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
0.000
|
Spaichingen
|
669 m
|
|
|
|
|
|
|
|
|
|
|
0.450
|
Obere Bahnhofstraße
|
|
|
|
|
0.680
|
|
|
|
|
|
1.000
|
B 14 Hauptstraße / Balgheimer Straße
|
|
|
|
|
|
L 431 Dreifaltigkeitsbergstraße
|
|
|
|
|
2.080
|
Spaichingen Nord
|
|
|
|
|
5.020
|
Denkingen
|
741 m
|
|
|
|
|
|
L 433a Klippeneckstraße
|
|
|
|
|
7.300
|
Schweinebrunnen Viaduct (52 m)
|
|
|
|
|
7.580
|
Setze Viaduct (150 m)
|
|
|
|
|
8.330
|
Wettbachtal Viaduct (300 m)
|
|
|
|
|
|
Wettbach
|
|
|
|
|
|
|
|
|
|
|
8.700
|
Au Tunnel (126 m)
|
|
|
|
|
9.390
|
L 433 Austraße
|
|
|
|
|
9.540
|
Hauptstraße
|
|
|
|
|
9.640
|
Gosheim
|
841 m
|
|
|
|
|
9.790
|
Wehinger Straße
|
|
|
|
|
|
10.200
|
|
|
|
|
13.600
|
L 435 Deilinger Straße
|
|
|
|
|
13.700
|
Mühlbach
|
|
|
|
|
13.930
|
Wehingen
|
779 m
|
|
|
|
|
16.090
|
Harras-Obernheim
|
768 m
|
|
|
|
|
|
K 5906 Obernheimer Straße
|
|
|
|
|
17.610
|
L 433
|
|
|
|
|
17.710
|
Reichenbach (Heuberg)
|
745 m
|
|
|
|
|
17.900
|
Streckenende 1. Bauabschnitt
|
|
|
|
|
|
|
|
|
|
|
20.00
|
| Egesheim 728 m | | (construction not carried out) |
|
|
|
|
|
25.90
|
|
|
|
|
|
|
|
|
|
|
| Source: German railway atlas
| |
|
The Heuberg Railway (Heubergbahn) was a 17.9 kilometres (11.1 mi) standard gauge railway line in the German federal state of Baden-Württemberg. The line operated between 1928 and 1966, and ran from Spaichingen, past five railway stations and a stop to Reichenbach am Heuberg. The line was originally planned as a narrow-gauge line through Reichenbach and Egesheim to Nusplingen. It was significant in the development and industrialization of the communities of the Heuberg plateau.