Guangzhou–Hong Kong high-speed train
An Vibrant Express EMU on the G6581 service (front) and a CR400BF-A EMU on G6503 service (back) at Guangzhou South | |
| Overview | |
|---|---|
| Service type | G-series trains |
| Status | Operational |
| Locale | |
| Predecessor | Guangzhou-Kowloon through train |
| First service | September 23, 2018 (to Guangzhou South) January 15, 2023 (to Guangzhou East) |
| Current operators | |
| Route | |
| Termini | Hong Kong West Kowloon |
| Distance travelled | 142 kilometres (88 mi) |
| Average journey time | 47m - 1h 30m |
| Train numbers |
|
| Lines used | |
| On-board services | |
| Classes |
|
| Catering facilities |
|
| Technical | |
| Rolling stock | |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 25 kV 50 Hz AC (Overhead line) |
| Operating speed |
|
| Track owners |
|
The Guangzhou–Hong Kong high-speed train (simplified Chinese: 穗港高速动车组列车; traditional Chinese: 穗港高速動車組列車) are high-speed train services operating between Hong Kong West Kowloon in Hong Kong and Guangzhou, at which both the Guangzhou South Station and Guangzhou East Station are in use.