Guangzhou–Zhanjiang high-speed railway
| Guangzhou–Zhanjiang High-speed Railway | |
|---|---|
CR400AF-S "Fuxing" EMUs at Yangjiang East railway station | |
| Overview | |
| Native name | 广湛高速铁路 |
| Status | In operation |
| Owner | CR Guangzhou |
| Locale | |
| Termini | |
| Stations | 10 |
| Service | |
| Type | High-speed rail |
| System | China Railway High-speed |
| Operator(s) | CR Guangzhou |
| History | |
| Opened | 22 December 2025 |
| Technical | |
| Line length | 401 km (249 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 25 kV 50 Hz AC (Overhead line) |
| Operating speed | 350 km/h (217 mph) |
| Guangzhou–Zhanjiang railway | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Simplified Chinese | 广湛高速铁路 | ||||||||||
| Traditional Chinese | 廣湛高速鐵路 | ||||||||||
| |||||||||||
The Guangzhou–Zhanjiang high-speed railway (simplified Chinese: 广湛高速铁路; traditional Chinese: 廣湛高速鐵路; pinyin: Guǎngzhàn Gāosù Tiělù) is a high-speed railway across the south of Guangdong province. Currently it runs from Guangzhou to Zhanjiang North. It links the cities of Guangzhou and Zhanjiang. Its design speed is 350 kilometres per hour (220 mph).