Golden Line (Delhi Metro)

Golden Line
Overview
Other nameLine 10, Line 11
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
Termini
StationsLine 10 (Main Line): 19
Elevated: 7
Underground: 12
Line 11 (Branch): 8
Elevated: 8
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned opening2026 (2026)
Technical
Line length38.17 km (23.72 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Terminal 1 IGI Airport
Delhi Aerocity
Mahipal Pur
Vasant Kunj
Kishangarh Metro Station
Chhatarpur
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket G-Block
Ambedkar Nagar
Khanpur
Sangam Vihar-Tigri
Anandmayee Marg Jn.
Tughlakabad Railway Colony
Tughlakabad Station
Sarita Vihar Depot
Sarita Vihar Depot
Madanpur Khadar
Kalindi Kunj

Lajpat Nagar
Andrews Ganj
Greater Kailash-1
Chirag Delhi
Pushpa Bhawan
Saket District Centre
Pushp Vihar
Saket G Block

The Golden Line (Line 10 and Line 11) is a rapid transit line of the Delhi Metro currently under-construction. It will start from Terminal 1-IGI Airport, which was previously planned from Delhi Aerocity, and end in Tughlakabad. Further it will extend to Kalindi Kunj in Phase 5A extension. It will be 29.785 km (18.508 mi) long with 19 stations, out of which seven will be elevated and 12 will be underground. The branch line will be 8.385 km (5.210 mi) long with eight stations, all the stations will be elevated.

It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.